• There are no items in your cart

ASTM C 993 : 1997

Superseded
Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

Standard Guide for In-Plant Performance Evaluation of Automatic Pedestrian SNM Monitors
Available format(s)

Hardcopy , PDF

Superseded date

11-11-2014

Language(s)

English

Published date

05-10-1997

CONTAINED IN VOL. 12.01, 2015 Pertains to Guide C1112 on applying special nuclear material (SNM) monitors, Guide C1169 on laboratory performance evaluation, Guide C1189 on calibrating pedestrian SNM monitors, and Guides C1236 and C1237 on in-plant evaluation.

1.1 This guide is affiliated with Guide C1112 on special nuclear material (SNM) monitors, Guide C1169 on laboratory performance evaluation, and Guide C1189 on calibrating pedestrian SNM monitors. This guide to in-plant performance evaluation is a comparatively rapid way to verify whether a pedestrian SNM monitor performs as expected for detecting SNM or SNM-like test sources.

1.1.1 In-plant performance evaluation should not be confused with the simple daily functional test recommended in Guide C1112. In-plant performance evaluation takes place less often than daily tests, usually at intervals ranging from weekly to once every three months. In-plant evaluations are also more extensive than daily tests and may examine both a monitor's nuisance alarm record and its detection sensitivity for a particular SNM or alternative test source.

1.1.2 In-plant performance evaluation also should not be confused with laboratory performance evaluation. In-plant evaluation is comparatively rapid, takes place in the monitor's routine operating environment, and its results are limited to verifying that a monitor is operating as expected, or to disclosing that it is not and needs repair or recalibration.

1.2 In-plant evaluation is one part of a program to keep SNM monitors in proper operating condition. Every monitor in a facility is evaluated. There are two applications of the in-plant evaluation: one used during routine operation and another used after calibration.

1.2.1 Routine Operational Evaluation -In this form of the evaluation, nuisance alarm records for each monitor are examined, and each monitor's detection sensitivity is estimated during routine operation. The routine operational evaluation is intended to reassure the plant operator, and his regulatory agency, that the monitor is performing as expected during routine operation. This evaluation takes place without pretesting, recalibration, or other activity that might change the monitor's operation, and the evaluation simulates the normal use of the monitor.

1.2.2 Post-Calibration Evaluation -This form of the evaluation is part of a maintenance procedure; it should always follow scheduled monitor recalibration, or recalibration connected with repair or relocation of the monitor, to verify that an expected detection sensitivity is achieved. Nuisance alarm data do not apply in this case because the monitor has just been recalibrated. Also, having just been calibrated, the monitor is likely to be operating at its best, which may be somewhat better than its routine operation.

1.3 The values stated in SI units are to be regarded as standard.

1.4 This standard does not purport to address the safety problems, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

Committee
C 26
DocumentType
Guide
Pages
7
PublisherName
American Society for Testing and Materials
Status
Superseded
SupersededBy

IEEE/ANSI N42.35-2006 American National Standard Evaluation and Performance of Radiation Detection Portal Monitors for Use in Homeland Security
ASTM C 1112 : 1999 Standard Guide for Application of Radiation Monitors to the Control and Physical Security of Special Nuclear Material
ASTM C 1237 : 1999 : R2005 Standard Guide to In-Plant Performance Evaluation of Hand-Held SNM Monitors (Withdrawn 2014)
ASTM C 1169 : 1997 Standard Guide for Laboratory Evaluation of Automatic Pedestrian SNM Monitor Performance
ASTM C 1236 : 1999 : R2005 Standard Guide for In-Plant Performance Evaluation of Automatic Vehicle SNM Monitors (Withdrawn 2014)
ASTM C 1236 : 1999 Standard Guide for In-Plant Performance Evaluation of Automatic Vehicle SNM Monitors
ASTM C 1237 : 1999 Standard Guide to In-Plant Performance Evaluation of Hand-Held SNM Monitors
ASTM C 1169 : 1997 : R2003 Standard Guide for Laboratory Evaluation of Automatic Pedestrian SNM Monitor Performance
ASTM C 1112 : 1999 : R2005 Standard Guide for Application of Radiation Monitors to the Control and Physical Security of Special Nuclear Material (Withdrawn 2014)
ASTM C 1169 : 1997 : R2012 Standard Guide for Laboratory Evaluation of Automatic Pedestrian SNM Monitor Performance (Withdrawn 2021)

ASTM C 1169 : 1997 Standard Guide for Laboratory Evaluation of Automatic Pedestrian SNM Monitor Performance

View more information
US$75.00
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.