• There are no items in your cart

BIS IS 15363-3 : 2004

Current
Current

The latest, up-to-date edition.

GUIDE TO TEROTECHNOLOGY (THE ECONOMIC MANAGEMENT OF ASSETS) - PART 3: GUIDE TO THE AVAILABLE TECHNIQUES
Published date

01-12-2013

FOREWORD
SECTION 1 - GENERAL
1 SCOPE
2 REFERENCES
3 TERMINOLOGY
SECTION 2 - GUIDANCE TO THE TECHNIQUES
4 LIFE CYCLE OF A PROJECT
5 LIFE CYCLE BREAKDOWN OF TECHNIQUE
6 LAYOUT OF GUIDANCE SHEETS FOR THE TECHNIQUES
7 GUIDANCE SHEETS FOR THE TECHNIQUES
SECTION 3 - CHECKLISTS
8 NINE CHECKLISTS ARE INCLUDED FOR USE BY
  DIFFERENT PERSONNEL IN THE ORGANIZATION
ANNEX A - LIST OF REFERRED INDIAN STANDARDS

Specifies detailed guidance to implement terotechnology practices in the work. Also includes series of checklists intended for use by persons responsible for a specific function in an organisation.

Committee
MSD 4
DocumentType
Standard
PublisherName
Bureau of Indian Standards
Status
Current

BIS IS 15363-2 : 2003 GUIDE TO TEROTECHNOLOGY - PART 2: INTRODUCTION TO TECHNIQUES AND APPLICATIONS

BIS IS 13407-1 : 1992(R2002) TECHNIQUES OF WORK STUDY - PART 1: METHOD STUDY
BIS IS 11810 : 2003 GUIDELINES TO ESTABLISH A VALUE ENGINEERING ACTIVITY
BIS IS 7200-1 : 1989(R2002) PRESENTATION OF STATISTICAL DATA - PART 1: TABULATION AND SUMMARIZATION
BIS IS 6363 : 1997(R2002) GLOSSARY OF TERMS IN WORK STUDY
BIS IS 9990 : 1998(R2009) GLOSSARY OF TERMS IN TEROTECHNOLOGY
BIS IS 7373 : 2003 HIP DISARTICULATION JOINT UNIT FOR LOWER LIMB PROSTHETIC FITMENTS - SPECIFICATION
BIS IS 397-0 : 2003 METHODS FOR STATISTICAL QUALITY CONTROL DURING PRODUCTION - PART 0: GUIDELINES FOR SELECTION OF CONTROL CHARTS
BIS IS 397-2 : 2003 METHOD FOR STATISTICAL QUALITY CONTROL DURING PRODUCTION - PART 2: CONTROL CHARTS FOR ATTRIBUTES
BIS IS 12040 : 2001(R2006) GUIDELINES FOR DEVELOPMENT OF SUPPLIER RATING SYSTEM
BIS IS/ISO 9000 : 2015 QUALITY MANAGEMENT SYSTEMS - FUNDAMENTALS AND VOCABULARY
BIS IS 397-3 : 2003 METHOD FOR STATISTICAL QUALITY CONTROL DURING PRODUCTION - PART 3: SPECIAL CONTROL CHARTS BY VARIABLES
BIS IS 397-1 : 2003 METHOD FOR STATISTICAL QUALITY CONTROL DURING PRODUCTION - PART 1: CONTROL CHARTS FOR VARIABLES
BIS IS 18001 : 2007(R2012) OCCUPATIONAL HEALTH AND SAFETY MANAGEMENT SYSTEM - REQUIREMENTS WITH GUIDANCE FOR USE
BIS IS/ISO 9001 : 2015 QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS
BIS IS 13407-2 : 1995(R2002) TECHNIQUES OF WORK STUDY - PART 2: WORK MEASUREMENT
BIS IS 14580-1 : 1998 USE OF NETWORK ANALYSIS FOR PROJECT MANAGEMENT - PART 1: MANAGEMENT, PLANNING, REVIEW, REPORTING AND TERMINATION PROCEDURES
BIS IS 397-4 : 2003 METHOD FOR STATISTICAL QUALITY CONTROL DURING PRODUCTION - PART 4: SPECIAL CONTROL CHARTS BY ATTRIBUTES
BIS IS 7200-2 : 1975(R2001) PRESENTATION OF STATISTICAL DATA - PART 2: DIAGRAMMATIC REPRESENTATION OF DATA
BIS IS 14001 : 2004 ENVIRONMENTAL MANAGEMENTS - REQUIREMENTS WITH GUIDANCE FOR USE
BIS IS/ISO 9004 : 2009 MANAGING FOR THE SUSTAINED SUCCESS OF AN ORGANIZATION - A QUALITY MANAGEMENT APPROACH

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.