BS 5964-1:1990
Current
The latest, up-to-date edition.
Hardcopy , PDF
English
09-30-1990
Committees responsible
National foreword
0 Introduction
1 Scope
2 Field of application
3 References
4 Definitions
Section one: General introduction
5 General introduction
Section two: Planning and organization of setting-out
6 Acquisition of information
7 Planning the setting-out
8 Setting-out drawings
9 Functional responsibilities
10 Qualifications
11 Survey and site documentation
12 Calculation
Section three: Setting-out and measuring procedures -
Accuracy specifications
13 Introduction
14 Primary system
15 Secondary system
16 Position points
17 Vertical transfer of points (plumbing)
18 Levelling
Bibliography
Annex
Example of a working/inspection schedule of setting-
out showing tasks and responsibilities
Tables
1 Example of application on site
2 Measurement
3 Example of application on site
Figures
1 Example of the three stages of setting-out as
adopted in this International Standard
2 Example of location grid
3 Relationship between the different grids used during
the building process
4 Example of the general principle of a primary
system, with some elevated points shown
5 Example of how profile boards might be placed
outside a proposed building
6 Some examples of the setting-out of secondary points
within the building using the primary system
7 Previously set-out points should be checked
according to 15.5 prior to further setting out
8 General examples of marking position points or lines
9 Verticality deviation
10 Examples of marking levels on shuttering
11 Use of a tension device when transferring levels
with the aid of a tape
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.