1. Scope
2. Normative references
3. Terms, definitions, symbols and abbreviations
3.1 Terms and definitions
3.2 Symbols and abbreviations
4. Service conditions and product specification levels
4.1 Service conditions
4.2 Product specification levels (PSL)
5. Common system requirements
5.1 Design and performance requirements
5.2 Materials
5.3 Welding
5.4 Quality control
5.5 Equipment marking
5.6 Storing and shipping
6. Specific requirements - Subsea tree assemblies
6.1 Design
6.2 Testing of subsea tree assemblies
6.3 Marking
6.4 Storing and shipping
7. Specific requirements - Subsea tree related equipment
        and sub-assemblies
7.1 Flanged end and outlet connections
7.2 ISO clamp hub-type connections
7.3 Threaded connections
7.4 Other end connectors
7.5 Studs, nuts and bolting
7.6 Ring gaskets
7.7 Tree connectors and tubing hanger spools
7.8 Tree stab subs and seal subs
7.9 Valves, valve blocks and actuators
7.10 TFL wye spool and diverter
7.11 Re-entry spool
7.12 Subsea tree cap
7.13 Tree cap running tool
7.14 Tree guide frame
7.15 Tree running tool
7.16 Tree piping
7.17 Flowline connector systems
7.18 Control pod running tool
7.19 Flowline connector support frame running/
        retrieving tools and related system interfaces
7.20 Tree-mounted hydraulic/electric control interfaces
7.21 Subsea chokes and actuators
7.22 Miscellaneous equipment
8. Specific requirements - Subsea wellhead
8.1 General
8.2 Temporary guide base
8.3 Permanent guide base
8.4 Conductor housing
8.5 Wellhead housing
8.6 Casing hangers
9. Specific requirements - Subsea tubing hanger system
9.1 General
9.2 Design
9.3 Materials
9.4 Testing
10. Specific requirements - Conventional mudline
        suspension equipment
10.1 General
10.2 Mudline suspension-landing/elevation ring
10.3 Casing hangers
10.4 Casing hanger running and tieback tools
10.5 Abandonment caps
10.6 Tieback adapters - Mudline conversion equipment
        for subsea completions
10.7 Tubing hanger spools - Mudline conversion
        equipment for subsea completions
10.8 Tubing hanger system - Mudline conversion
        equipment for subsea completions
11. Scope specific requirements - Drill-through
        mudline suspension equipment
11.1 General
11.2 Conductor housing
11.3 508 mm (20 in) or 473 mm (18 5/8 in) casing hanger
11.4 Wellhead housing
11.5 Casing hangers
11.6 Annulus seal assemblies
11.7 Bore protectors and wear bushings
11.8 Abandonment caps
11.9 Running, retrieving and tsting tools
12. Purchasing guide lines
12.1 General
12.2 Typical wellhead and tree configurations
12.3 Product specification levels
12.4 Material class rating
Annex A (informative) Conventional subsea trees
Annex B (informative) Horizontal subsea trees
Annex C (informative) Subsea wellhead
Annex D (informative) Subsea tubing hanger
Annex E (normative) Conventional mudline suspension and
                      conversion system
Annex F (informative) Drill-through mudline suspension
                      systems
Annex G (normative) Recommended flange bolt torques
Annex H (normative) Design and testing of subsea wellhead
                      running, retrieving and testing tools
Annex I (informative) Procedure for the application of a
                      coating system
Bibliography

Defines conventional mudline wellhead, subsea copewellhead, drill through mudline wellhead, conventional subsea trees and horizontal subsea trees. It also defines the associated tooling required to handle, test and install the equipment. Areas of design, material, welding, quality control (including factory acceptance testing), marking, storing and shipping for both individual sub-assemblies (used to build complete subsea tree assemblies) and complete subsea tree assemblies, are also specified.

Committee
PSE/17
DevelopmentNote
Supersedes 97/711065 DC. (11/2005) Supersedes 06/30125909 DC. (02/2012) Available in CD-ROM format only. (03/2012)
DocumentType
Standard
Pages
176
PublisherName
British Standards Institution
Status
Current
SupersededBy
Supersedes

ASME PV CODE 8 DIV 2 : 2017 BOILER AND PRESSURE VESSEL CODE - RULES FOR CONSTRUCTION OF PRESSURE VESSELS DIVISION 2- ALTERNATIVE RULES
SAE J 517 : 2016 HYDRAULIC HOSE
ASTM E 446 : 2015 : REDLINE Standard Reference Radiographs for Steel Castings Up to 2 in. (50.8 mm) in Thickness
ISO 8501-1:2007 Preparation of steel substrates before application of paints and related products — Visual assessment of surface cleanliness — Part 1: Rust grades and preparation grades of uncoated steel substrates and of steel substrates after overall removal of previous coatings
ASNT SNT TC 1A : 2016 TOPICAL OUTLINES FOR QUALIFICATION OF NONDESTRUCTIVE TESTING PERSONNEL
ISO 13628-1:2005 Petroleum and natural gas industries — Design and operation of subsea production systems — Part 1: General requirements and recommendations
ASTM D 3045 : 1992 PRACTICE FOR HEAT AGING OF PLASTICS WITHOUT LOAD
ASME PV CODE 9 : 2017 BOILER AND PRESSURE VESSEL CODE - WELDING, BRAZING, AND FUSING QUALIFICATIONS - QUALIFICATION STANDARD FOR WELDING, BRAZING, AND FUSING PROCEDURES; WELDERS; BRAZERS; AND WELDING, BRAZING, AND FUSING OPERATORS
ISO 13628-9:2000 Petroleum and natural gas industries — Design and operation of subsea production systems — Part 9: Remotely Operated Tool (ROT) intervention systems
ISO 13628-3:2000 Petroleum and natural gas industries — Design and operation of subsea production systems — Part 3: Through flowline (TFL) systems
API 6J1 : 2000 ELASTOMER LIFE ESTIMATION TESTING PROCEDURES
ASTM D 1414 : 2015 : REDLINE Standard Test Methods for Rubber O-Rings
ASME PV CODE 8 DIV 1 : 2017 BOILER AND PRESSURE VESSEL CODE - RULES FOR CONSTRUCTION OF PRESSURE VESSELS DIVISION 1
ASME B31.8 : 2016 Gas Transmission and Distribution Piping Systems
ASME B16.11 : 2016 FORGED FITTINGS, SOCKET-WELDING AND THREADED
SSPC-SP 10 : 2015 NEAR-WHITE BLAST CLEANING
ASME B31.3:2016 PROCESS PIPING
ISO 3183:2012 Petroleum and natural gas industries Steel pipe for pipeline transportation systems
ASME PV CODE 3 SET : 2013 ASME BOILER AND PRESSURE VESSEL CODE (BPVC) - RULES FOR CONSTRUCTION OF NUCLEAR FACILITY COMPONENTS (SET)
ASME B31.4 : 2016 PIPELINE TRANSPORTATION SYSTEMS FOR LIQUIDS AND SLURRIES
SAE AS 568 : 2014 AEROSPACE SIZE STANDARD FOR O-RINGS
NACE RP 01 76 : 2003 CORROSION CONTROL OF STEEL FIXED OFFSHORE STRUCTURES ASSOCIATED WITH PETROLEUM PRODUCTION
NACE SP 01 76 : 2007 CORROSION CONTROL OF SUBMERGED AREAS OF PERMANENTLY INSTALLED STEEL OFFSHORE STRUCTURES ASSOCIATED WITH PETROLEUM PRODUCTION
ASTM E 10 : 2017-05 TEST METHOD FOR BRINELL HARDNESS OF METALLIC MATERIALS
ISA 75.01.01 : 2007 INDUSTRIAL-PROCESS CONTROL VALVES - PART 2-1: FLOW CAPACITY - SIZING EQUATIONS FOR FLUID FLOW UNDER INSTALLED CONDITIONS
SAE J 343 : 2016 TEST AND TEST PROCEDURES FOR SAE 100R SERIES HYDRAULIC HOSE AND HOSE ASSEMBLIES
ISO 13628-7:2005 Petroleum and natural gas industries — Design and operation of subsea production systems — Part 7: Completion/workover riser systems
API 6HT : 2013 HEAT TREATMENT AND TESTING OF CARBON AND LOW ALLOY STEEL LARGE CROSS SECTION AND CRITICAL SECTION COMPONENTS
ISO 13625:2002 Petroleum and natural gas industries — Drilling and production equipment — Marine drilling riser couplings
ASTM A 453/A453M : 2017 : REDLINE Standard Specification for High-Temperature Bolting, with Expansion Coefficients Comparable to Austenitic Stainless Steels
ISO 13533:2001 Petroleum and natural gas industries — Drilling and production equipment — Drill-through equipment
ISO 10423:2009 Petroleum and natural gas industries Drilling and production equipment Wellhead and christmas tree equipment
ASME PV CODE 5 : 2017 BOILER AND PRESSURE VESSEL CODE - NONDESTRUCTIVE EXAMINATION
ASTM E 280 : 2015 : REDLINE Standard Reference Radiographs for Heavy-Walled (4<fraction><num>1</num><den>2</den></fraction > to 12 in. (114 to 305 mm)) Steel Castings
SAE AS 4059F : 2013 AEROSPACE FLUID POWER - CONTAMINATION CLASSIFICATION FOR HYDRAULIC FLUIDS
MSS SP 55 : 2011 QUALITY STANDARD FOR STEEL CASTINGS FOR VALVES, FLANGES, FITTINGS, AND OTHER PIPING COMPONENTS - VISUAL METHOD FOR EVALUATION OF SURFACE IRREGULARITIES
ISO 13628-8:2002 Petroleum and natural gas industries — Design and operation of subsea production systems — Part 8: Remotely Operated Vehicle (ROV) interfaces on subsea production systems
MIL-STD-120 Base Document:1950 GAGE INSPECTION
ASME B18.2.2 : 2015 NUTS FOR GENERAL APPLICATIONS: MACHINE SCREW NUTS, HEX, SQUARE, HEX FLANGE, AND COUPLING NUTS (INCH SERIES)
ISO 10424-1:2004 Petroleum and natural gas industries Rotary drilling equipment Part 1: Rotary drill stem elements
ASTM E 709 : 2015 : REDLINE Standard Guide for Magnetic Particle Testing
AWS D1.1/D1.1M : 2015 STRUCTURAL WELDING CODE-STEEL
ASTM D 2990 : 2017 : REDLINE Standard Test Methods for Tensile, Compressive, and Flexural Creep and Creep-Rupture of Plastics
API 17D : 2011 DESIGN AND OPERATION OF SUBSEA PRODUCTION SYSTEMS - SUBSEA WELLHEAD AND TREE EQUIPMENT
ISA 75.02 : 1996 CONTROL VALVE CAPACITY TEST PROCEDURES
ISO 11960:2014 Petroleum and natural gas industries Steel pipes for use as casing or tubing for wells
API TR 17TR3 : 2004 AN EVALUATION OF THE RISKS AND BENEFITS OF PENETRATIONS IN SUBSEA WELLHEADS BELOW THE BOP STACK
ASTM E 92 : 2017 : REDLINE Standard Test Methods for Vickers Hardness and Knoop Hardness of Metallic Materials

View more information
US$426.44
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.