EN 1279-6:2018
Current
Current
The latest, up-to-date edition.
Glass in building - Insulating glass units - Part 6: Factory production control and periodic tests
Published date
07-25-2018
Publisher
This document describes the routine factory production control, the periodic testing and inspection and test methods to verify that an insulating glass unit (IGU) conforms to the system description.
Sorry this product is not available in your region.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.