• There are no items in your cart

EN 288-7 : 1995

Superseded
Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

SPECIFICATION AND APPROVAL OF WELDING PROCEDURES FOR METALLIC MATERIALS - APPROVAL BY A STANDARD WELDING PROCEDURE FOR ARC WELDING
Superseded date

08-01-2004

Published date

01-12-2013

0 Introduction
1 Scope
2 Normative references
3 Definitions
4 Preliminary welding procedure specification (pWPS)
5 Approval of the standard welding procedure
5.1 General
5.2 Parent metal
5.3 Consumables
5.4 Parent metal thickness
5.5 Fillet weld throat thickness
5.6 Diameter of pipes
5.7 Branch connection
6 Use of a standard welding procedure
6.1 General
6.2 Related to the user of standard welding procedure
6.3 Related to welding equipment
6.4 Related to the personnel
6.5 Related to the environmental conditions
7 Validity
8 Preparation and documentation

Defines the conditions for the approval of a standard welding procedure. Also establishes the conditions, limits and ranges of approval needed for the use of standard welding procedures.

DocumentType
Standard
PublisherName
Comite Europeen de Normalisation
Status
Superseded
SupersededBy

Standards Relationship
UNI EN 288-7 : 1997 Identical
UNE-EN 288-7:1996 Identical
NF EN 288-7 : 1995 Identical
I.S. EN 288-7:1995 Identical
SN EN 288-7 : 1995 Identical
NEN EN 288-7 : 1995 Identical
NBN EN 288-8 : 1995 Identical
NS EN 288-7 : 1ED 1995 Identical
NBN EN 288-7 : 1995 Identical
BS EN 288-7:1995 Identical
DIN EN 288-7:1995-08 Identical

DIN 4099-2:2003-08 WELDING OF REINFORCING STEEL - PART 2: QUALITY ASSURANCE
05/30128654 DC : DRAFT FEB 2005 EN 1775 - GAS SUPPLY - GAS PIPEWORK FOR BUILDINGS - MAXIMUM OPERATING PRESSURE LESS THAN OR EQUAL TO 5 BAR - FUNCTIONAL RECOMMENDATIONS
01/714474 DC : DRAFT NOV 2001 BS EN 14276-1 - PRESSURE EQUIPMENT FOR REFRIGERATING SYSTEMS AND HEAT PUMPS - PART 1: VESSELS - GENERAL REQUIREMENTS
99/707161 DC : DRAFT APR 99 PREN 13480-4 METALLIC INDUSTRIAL PIPING - PART 4: FABRICATION AND INSTALLATION
99/707160 DC : DRAFT APR 99 DRAFT BS: PREN 13480-3 - METALLIC INDUSTRIAL PIPING - DESIGN AND CALCULATION
BS EN 288-8:1995 Specification and approval of welding procedures for metallic materials Approval by a pre-production welding test
BS EN ISO 13535:2001 Petroleum and natural gas industries. Drilling and production equipment. Hoisting equipment Hoisting equipment
NF ENV 1090-1 : 96 FD EXECUTION OF STEEL STRUCTURES - PART 1: GENERAL RULES AND RULES FOR BUILDINGS
ISO 13535:2000 Petroleum and natural gas industries Drilling and production equipment Hoisting equipment
EN 288-8 : 1995 SPECIFICATION AND APPROVAL OF WELDING PROCEDURES FOR METALLIC MATERIALS - PART 8: APPROVAL BY A PRE-PRODUCTION WELDING TEST
EN ISO 13535:2000 Petroleum and natural gas industries - Drilling and production equipment - Hoisting equipment (ISO 13535:2000)
DIN 8563-108 : DRAFT 92 QUALITY ASSURANCE OF WELDED STRUCTURES; SPECIFICATION AND APPROVAL OF WELDING PROCEDURES FOR METALLIC MATERIALS; PART 8: APPROVAL BY APRE-PRODUCTION WELDING TEST

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.