• There are no items in your cart

EN 61850-10:2013

Current

Current

The latest, up-to-date edition.

Communication networks and systems for power utility automation - Part 10: Conformance testing

Published date

07-05-2013

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Introduction to conformance testing
6 Device related conformance testing
7 Tool related conformance testing
8 Performance tests
9 Additional tests
Annex A (informative) - Examples of test procedure template
Annex ZA (normative) - Normative references to international
         Publications with their corresponding
         European publications
Bibliography

IEC 61850-10:2012 specifies standard techniques for testing of conformance of client, server and sampled value devices and engineering tools, as well as specific measurement techniques to be applied when declaring performance parameters. The use of these techniques will enhance the ability of the system integrator to integrate IEDs easily, operate IEDs correctly, and support the applications as intended. The major technical changes with regard to the previous edition are as follows: - updates to server device conformance test procedures; - additions of certain test procedures (client device conformance, sampled values device conformance, (engineering) tool related conformance, GOOSE performance).

Committee
CLC/TC 57
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Current

EN 61400-25-5:2017 Wind energy generation systems - Part 25-5: Communications for monitoring and control of wind power plants - Compliance testing
I.S. EN 62271-3:2015 HIGH-VOLTAGE SWITCHGEAR AND CONTROLGEAR - PART 3: DIGITAL INTERFACES BASED ON IEC 61850
EN 62271-3:2015 High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850
EN 61850-7-420:2009 Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes
I.S. EN 61850-7-420:2009 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-420: BASIC COMMUNICATION STRUCTURE - DISTRIBUTED ENERGY RESOURCES LOGICAL NODES
BS EN 62271-3:2015 High-voltage switchgear and controlgear Digital interfaces based on IEC 61850
BS EN 61850-7-1:2011 Communication networks and systems for power utility automation Basic communication structure. Principles and models
BS EN 61850-7-410 : 2013 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL
EN 61850-7-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011)
CEI EN 61850-7-1 : 2012 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS
I.S. EN 61400-25-5:2017 WIND ENERGY GENERATION SYSTEMS - PART 25-5: COMMUNICATIONS FOR MONITORING AND CONTROL OF WIND POWER PLANTS - COMPLIANCE TESTING
I.S. EN 61850-7-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011 (EQV))
BS EN 61850-7-420:2009 Communication networks and systems for power utility automation Basic communication structure. Distributed energy resources logical nodes
BS EN 61400-25-5:2017 Wind energy generation systems Communications for monitoring and control of wind power plants. Compliance testing
EN 61850-7-410:2013/A1:2016 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-410: BASIC COMMUNICATION STRUCTURE - HYDROELECTRIC POWER PLANTS - COMMUNICATION FOR MONITORING AND CONTROL (IEC 61850-7-410:2012/A1:2015)

IEC 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
EN 61850-6:2010 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
IEC 61850-7-2:2010 Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI)
IEC 62439-3:2016 Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR)
IEC 61850-6:2009 Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs
EN 61850-7-2:2010 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-2: BASIC INFORMATION AND COMMUNICATION STRUCTURE - ABSTRACT COMMUNICATION SERVICE INTERFACE (ACSI)
EN 61850-5:2013 Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models
EN 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
IEC 61850-7-1:2011 Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models
EN 61850-7-1:2011 COMMUNICATION NETWORKS AND SYSTEMS FOR POWER UTILITY AUTOMATION - PART 7-1: BASIC COMMUNICATION STRUCTURE - PRINCIPLES AND MODELS (IEC 61850-7-1:2011)
IEC 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
EN 61850-7-3:2011 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
EN ISO 9001:2015 Quality management systems - Requirements (ISO 9001:2015)
IEC 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
EN 61850-3:2014 Communication networks and systems for power utility automation - Part 3: General requirements
IEC 61850-4:2011 Communication networks and systems for power utility automation - Part 4: System and project management
IEC 61850-7-4:2010 Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes
IEC 61850-7-3:2010 Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes
EN 61850-4:2011 Communication networks and systems for power utility automation - Part 4: System and project management
IEEE 1588-2008 REDLINE IEEE Standard for a Precision Clock Synchronization Protocol for Networked Measurement and Control Systems
EN 61850-9-2:2011 Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3
IEC TS 61850-2:2003 Communication networks and systems in substations - Part 2: Glossary
EN 61850-8-1:2011 Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3
IEC 61850-3:2013 Communication networks and systems for power utility automation - Part 3: General requirements

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.