• There are no items in your cart

FM 1011,1012,1013 : 2009

Current
Current

The latest, up-to-date edition.

DELUGE AND PREACTION SPRINKLER SYSTEMS
Published date

01-12-2013

1. INTRODUCTION
   1.1 PURPOSE
   1.2 SCOPE
   1.3 BASIS FOR REQUIREMENTS
   1.4 BASIS FOR APPROVAL
   1.5 BASIS FOR CONTINUED APPROVAL
   1.6 EFFECTIVE DATE
   1.7 SYSTEM OF UNITS
   1.8 APPLICABLE DOCUMENTS
   1.9 DEFINITIONS
2. GENERAL INFORMATION
   2.1 PRODUCT INFORMATION
   2.2 APPROVAL APPLICATION REQUIREMENTS
   2.3 REQUIREMENTS FOR SAMPLES FOR EXAMINATION
3. GENERAL REQUIREMENTS
   3.1 REVIEW OF DOCUMENTATION
   3.2 DELUGE SPRINKLER SYSTEMS - APPROVAL STANDARD
        CLASS 1011
   3.3 PREACTION SPRINKLER SYSTEMS - APPROVAL STANDARD
        CLASS 1012/1013
   3.4 SOLENOID VALVES USED IN ELECTRIC RELEASE SYSTEMS
   3.5 DEVICES TO PREVENT DELUGE AND PREACTION SYSTEMS FROM
        RESETTING AUTOMATICALLY AFTER INITIAL TRIP
   3.6 RELEASE CONTROL PANELS FOR PREACTION AND DELUGE
        SPRINKLER SYSTEMS
   3.7 FIRE DETECTION DEVICES
   3.8 MARKINGS
   3.9 VALVE SIZES
   3.10 RATED WORKING PRESSURE
   3.11 INSTALLATION, MAINTENANCE, OPERATION AND TESTING
        MANUAL
   3.12 ELECTRICAL INITIATING SYSTEM REQUIREMENTS
   3.13 MATERIALS
   3.14 ENVIRONMENT
   3.15 CALIBRATION
   3.16 TOLERANCES
4. PERFORMANCE REQUIREMENTS
   4.1 EXAMINATION
   4.2 DELUGE SPRINKLER SYSTEMS OPERATIONAL TESTS
   4.3 SINGLE-INTERLOCK PREACTION OPERATIONAL TESTS
   4.4 DOUBLE-INTERLOCK PREACTION OPERATIONAL TESTS
   4.5 ACCELERATORS
   4.6 HYDROSTATIC TESTS - TRIM PIPING AND COMPONENTS
        (EXCLUDING SOLENOID VALVES)
   4.7 SOLENOID VALVE TESTING
   4.8 OPTIONAL TESTING
   4.9 ELECTRICAL INITIATING SYSTEM TESTS
   4.10 ADDITIONAL TESTS
5. OPERATIONS REQUIREMENTS
   5.1 DEMONSTRATED QUALITY CONTROL PROGRAM
   5.2 FACILITIES AND PROCEDURES AUDIT (F&PA)
   5.3 INSTALLATION INSPECTIONS
   5.4 MANUFACTURER'S RESPONSIBILITIES
   5.5 MANUFACTURING AND PRODUCTION TESTS
APPENDIX A: COMMON PROBLEMS WITH DELUGE AND PREACTION
   SPRINKLER SYSTEMS
APPENDIX B: FM APPROVALS CERTIFICATION MARKS
APPENDIX C: FIGURES
APPENDIX D: FIRE ALARM SIGNALING SYSTEMS - TEST OUTLINE
APPENDIX E: SAMPLE LISTINGS
   DELUGE SPRINKLER SYSTEMS (CLASS 1011)
   PREACTION SPRINKLER SYSTMS (CLASS 1012)
   REFRIGERATED AREA SPRINKLER SYSTEMS (CLASS 1013)
APPENDIX F: UNITS OF MEASUREMENT
APPENDIX G: TOLERANCE

Describes the design and performance requirements for 1-1/2, 2, 2-1/2, 3, 4, 6 and 8 inch nominal pipe size (NPS) Deluge and Preaction Sprinkler Systems for use in automatic sprinkler systems. Other sizes may be evaluated on a case-by-case basis.

DevelopmentNote
Supersedes FM 1011,12. (11/2009)
DocumentType
Standard
PublisherName
Factory Mutual Research Corporation
Status
Current
Supersedes

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.