• There are no items in your cart

FM 1111 : 1973

Current

Current

The latest, up-to-date edition.

POST-INDICATOR-VALVE-ASSEMBLY

Published date

01-12-2013

I. INTRODUCTION
II. GENERAL REQUIREMENTS
     2.1 Glossary
     2.2 Instructional Manual
     2.3 Marketing
     2.4 Markings
     2.5 Sizes
     2.6 Rated Working Pressure
     2.7 Factory Tests
III. DESIGN
     3.1 Waterway
     3.2 Orientation
     3.3 Visibility
     3.4 Design Factors of Safety
     3.5 Water Hammer
     3.6 Operation
     3.7 Ease of Operation
     3.8 Serviceability
     3.9 Impact Resistance (Shock Loading)
     3.10 Friction Loss
     3.11 Locking
     3.12 Seat Leakage
     3.13 Materials
     3.14 Post Design
IV. TESTS
     4.1 General
     4.2 Visibility
     4.3 Water Hammer
     4.4 Loss of Power Transmission Control
     4.5 Hydrostatic Test
     4.6 Seat Leakage
     4.7 Impact Resistance
     4.8 Durability
     4.9 Friction Loss
     4.10 Stem Seal
     4.11 Other

DocumentType
Standard
PublisherName
Factory Mutual Research Corporation
Status
Current

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.