GR 1502 CORE : ISSUE 2010
Current
The latest, up-to-date edition.
CENTRAL OFFICE/NETWORK ENVIRONMENT DETAIL ENGINEERING GENERIC REQUIREMENTS
01-12-2013
1 Introduction
2 Equipment Layout
3 Cross-Connect Systems
4 Power Facilities - Battery/Rectifiers (AC/DC)
5 Power Facilities - Converters (DC/DC)
6 Power Facilities - Inverters (DC/AC)
7 Power Facilities - Uninterruptable Power Supplies (UPS)
8 Power Facilities - Standby AC Power
9 Power Facilities - Power Systems Monitor/Controller (PSMC)
10 Power Facilities - DC Power Distribution
11 Power Facilities - Ring, Tone, and Cadence Plants
12 Central Office Grounding
13 Cable Rack and Auxiliary Framing - Cable Rack
14 Cable Rack and Auxiliary Framing - Auxiliary Framing -
Low-Type
15 Cable Rack and Auxiliary Framing - Auxiliary Framing -
High-Type
16 Rolling Ladders
17 Bracing
18 Cable Distribution Systems (CDSs)
19 Frame and Aisle Lighting - Fluorescent Type Lighting
20 Appliance Outlets and Miscellaneous Raceway
21 Frame and Aisle Lighting - Emergency Lighting
22 Operations Systems (OS)
23 Alarms
24 Wire and Cable Requirements
25 General Interface Requirements
26 Central Office Equipment (COE) Building Environment
Requirements
27 Central Office Equipment (COE) Records - Introduction
28 Office Record Index, Serial Numbers, and Central Office
Listing (COL)
29 Numbering System
30 Central Office Base Records
31 Supplier Standard Drawings/Documents
32 Interconnect Drawings
33 Central Office Base Record Marking and Creation
34 Procedures and Flows
35 Items Common to All Records
36 Document Types/Dash Numbers
37 Detail Engineering Service Provider (DESP) Output
Appendix A: References
Appendix B: Glossary
Requirement-Object Index
List of Figures
List of Tables
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.