IEC 60794-4-1:1999
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
09-12-2022
English - French
01-07-1999
Foreword
1 Scope
2 Normative References
3 Definitions
4 Requirements for OPGW
4.1 General
4.2 Optical fibres
4.3 Optical unit(s)
4.4 Stranded wires
4.5 Grease
4.6 Water blocking
5 OPGW Characteristics
6 Tests
6.1 Classification of tests
6.2 Test requirements
6.3 Inspection
7 Packaging and Marking
8 Test Requirements
8.1 Stress-strain test
8.2 Tensile performance test
8.3 Sheave test
8.4 Aeolian vibration test
8.5 Galloping test (when specified)
8.6 Creep test (when specified)
8.7 Temperature cycling test (when specified)
8.8 Water penetration test (when specified)
8.9 Short-circuit test
8.10 Lightning test
Annex A (informative) Recommended methods of calculating rated
tensile strength, cross-section of a
layer of trapezoidal shaped wires,
modulus of elasticity, linear expansion
and d.c. resistance
Annex B (normative) Sheave test methods
Annex C (normative) Aeolian vibration test method
Annex D (normative) Galloping test method
Annex E (normative) Short-circuit test method
Annex F (normative) Tests for lightning conditions
Annex G (normative) Test method for determining endurance
capability of OPGW against lightning
strike
Figure B.1 - Sheave test arrangement - Method A
Figure B.2 - Sheave test arrangement - Method B
Figure C.1 - Aeolian vibration test arrangement
Figure D.1 - Galloping test arrangement
Figure E.1 - Short-circuit test arrangement
Figure G.1 - Lightning test arrangement
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.