• There are no items in your cart

IEC PAS 62337:2002

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

Milestones and activities during commissioning of electrical instrumentation and control systems in the process industry

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Superseded date

11-08-2006

Language(s)

English

Published date

08-30-2002

INTRODUCTION
1 Scope
2 Definitions
3 Recommendations for the usage of this document
4 General preparations before acceptance of plant
5 Completion of erection
   5.1 Mechanical checks and tests
   5.2 Procedure
6 Precommissioning (mechanical completion)
   6.1 General
   6.2 Procedure
7 Commissioning
   7.1 General
   7.2 Procedure
8 Performance test and acceptance of plant
   8.1 General
   8.2 Conditions for Commencement of Performance Test
   8.3 Execution of Performance Test
   8.4 Evaluation and report of Performance Test
Annex A (normative) List of documents to be utilized for
        the precommissioning and commissioning phase
   A.1 Technical documents
   A.2 Procedures
   A.3 General and coordination documents
Annex B (informative) Description of precommissioning activities
Annex C (normative) Mechanical completion certificate
Annex D (normative) Description of commissioning activities
Annex E (normative) Acceptance of plant certificate
Annex F (normative) Project specific items
Figure
Tables

Describes phases and milestones (see figure 1) and describes as an example activities after the "Completion of Erection" milestone of the project and prior to the Acceptance of Plant by the owner. For each type of process/plant the activities shall be adapted.

DocumentType
Miscellaneous Product
Pages
34
PublisherName
International Electrotechnical Committee
Status
Superseded
SupersededBy

Standards Relationship
DIN IEC 62337:2004-08 (Draft) Identical
NEN NPR IEC/PAS 62337 : 2002 Identical

DIN ISO/TS 16952-1:2007-03 TECHNICAL PRODUCT DOCUMENTATION - REFERENCE DESIGNATION SYSTEM - PART 1: GENERAL APPLICATION RULES
ISO/TS 16952-1:2006 Technical product documentation Reference designation system Part 1: General application rules
DD ISO/TS 16952-1:2007 Technical product documentation. Reference designation system General application rules

View more information
US$273.00
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.