ISO 23469:2005
Current
The latest, up-to-date edition.
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
English
11-11-2005
ISO 23469:2005 provides guidelines for specifying seismic actions for designing geotechnical works, including buried structures (e.g. buried tunnels, box culverts, pipelines, and underground storage facilities), foundations (e.g. shallow and deep foundations, and underground diaphragm walls), retaining walls (e.g. soil retaining and quay walls), pile-supported wharves and piers, earth structures (e.g. earth and rockfill dams and embankments), gravity dams, landfill and waste sites.
The guidelines provided in ISO 23469:2005 are general enough to be applicable for both new and existing geotechnical works. However, for use in practice, procedures more specific to existing geotechnical works can be needed, such as those described for existing structures in ISO 13822.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.