• There are no items in your cart

NECA/IESNA 501 : 2006

Current

Current

The latest, up-to-date edition.

INSTALLING EXTERIOR LIGHTING SYSTEMS

Published date

01-12-2013

Foreword
1. Scope
2. Definitions
3. General Installation Practices
   3.1 Receiving, Storing, Protecting, and Delivering
   3.2 Site Preparation
   3.3 Unpacking and Handling Material
   3.4 Coordination with Other Trades
   3.5 Securing Equipment in Place
   3.6 Installation
   3.7 Temporary Lighting
   3.8 Interior Clean-out
   3.9 Preliminary Field Adjustments
   3.10 Lamping and Accessories
   3.11 Final Cleaning and Completion of Luminaire Installation
   3.12 Testing
   3.13 Lamp Burn-in
   3.14 Site Clean-up
   3.15 Punchlist and Acceptance
   3.16 Aiming and Artistic Adjustments
   3.17 Spare Parts
   3.18 Lamp List
4. Pole-Mounted Lighting Systems and Bollards
   4.1 Site Layout and Coordination
   4.2 Installation on Foundations
5. Recessed, Ceiling, and Wall-Mounted Lighting Systems
   5.1 General
   5.2 Installation of Recessed Luminaires
   5.3 Installation of Surface-Mounted Luminaires
6. Ground-Mounted Lighting Systems
   6.1 In-ground Luminaires
   6.2 Above-ground Luminaires
   6.3 Low-Voltage Landscape Lighting
Annex A: Reference Standards

Describes installation procedures for installing and maintaining exterior lighting systems.

DevelopmentNote
Included in NECA 5000 SERIES. (11/2006)
DocumentType
Standard
PublisherName
National Electrical Contractors Association
Status
Current

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.