• There are no items in your cart

NFPA 8504 : 1996

Withdrawn
Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by
withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

ATMOSPHERIC FLUIDIZED-BED BOILER OPERATION
Available format(s)

Hardcopy

Withdrawn date

04-14-2021

Language(s)

English

Published date

01-01-1996

Chapter 1 Introduction
1.1 Scope
1.2 Purpose
Chapter 2 General
2.1 Furnace explosions
2.2 Furnace pressure excursions
2.3 Manufacture, design, and engineering
2.4 Installation
2.5 Coordination of design, construction, and
            operation
2.6 Maintenance organization
2.7 Basic operating objectives
2.8 Training
2.9 Fluidized-bed combustion - special problems
Chapter 3 Definitions
3.1 Definitions
Chapter 4 Equipment requirements
4.1 Structural design
4.2 Fuel burning system
4.3 Burner management system, logic
4.4 Combustion monitoring and tripping systems
4.5 Combustion control systems
4.6 Warm-up burners and lances
4.7 Power supplies
4.8 Operating information
Chapter 5 Furnace pressure excursion prevention
5.1 General
5.2 Furnace pressure control systems
5.3 Sequence of operations
5.4 Interlock system
5.5 Alarm system
Chapter 6 Sequence of operations
6.1 General
6.2 Operational requirements
6.3 Emergency conditions not requiring shutdown or
            trip
6.4 General operating requirements - all conditions
Chapter 7 Sequence of operations for gas-fired warm-up
            burners
7.1 General
7.2 Gas firing - special problems
7.3 Warm-up burner subsystem requirements
7.4 Flame monitoring and tripping system
7.5 Sequence of operations
7.6 Interlock system
7.7 Alarm system
7.8 Boiler front control (supervised manual)
Chapter 8 Sequence of operations for oil-fired warm-up
            burners
8.1 General
8.2 Oil firing - special problems
8.3 Warm-up burner subsystem requirements
8.4 Flame monitoring and tripping system
8.5 Sequence of operations
8.6 Interlock system
8.7 Alarm system
8.8 Boiler front control (supervised manual)
Chapter 9 Interlock system
9.1 General
9.2 Functional requirements
9.3 System requirements
Chapter 10 Alarm system
10.1 Functional requirements
10.2 System requirements
Chapter 11 Referenced publications
Appendix A Explanatory material
Appendix B Guidelines for determining the minimum permitted
            temperature for feeding a fuel into a fluidized
            bed
Appendix C Referenced publications
Index

Applies to boilers with a fuel input rating of 12,500,000 Btu/hr (3663 kW) or greater. Also applies only to boilers using atmospheric fluidized-bed combustion.

DevelopmentNote
Supersedes and renumbers NFPA 85H (07/2004)
DocumentType
Standard
Pages
69
PublisherName
National Fire Protection Association
Status
Withdrawn
SupersededBy
Supersedes

ICC 2012 INTERNATIONAL MECH. CODE : 2012 INTERNATIONAL MECHANICAL CODE

NFPA 31 : 2016 INSTALLATION OF OIL-BURNING EQUIPMENT
ASME B31.1 : 2016 POWER PIPING

View more information

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.