• There are no items in your cart

TR 102 615 : 1.1.1

Current

Current

The latest, up-to-date edition.

POWERLINE TELECOMMUNICATIONS (PLT); PLUGTESTS[TM] 2007 ON COEXISTENCE BETWEEN PLT MODEM SYSTEMS; TEST CASES

Available format(s)

Hardcopy , PDF

Language(s)

English

Intellectual Property Rights
Foreword
Introduction
1 Scope
2 References
  2.1 Normative references
  2.2 Informative references
3 Abbreviations
4 General Test Conditions, Traffic Generation and Traffic
  Monitoring
  4.1 Coupling and Decoupling of the PLC-Signal
  4.2 Shielding of the Test Set-up
5 Tests with one PLT system
  5.1 CDCF Timing - Comparison with Simulation Model
  5.2 CDCF - PSD
  5.3 CDCF Timing - Sync Point and AC line cycle
  5.4 CDCF Timing - Burst
6 Tests with more PLT systems
  6.1 CDCF reception in dependence of attenuation
  6.2 CDCF reception in the presence of a narrowband
      disturbance source
  6.3 CDCF reception in the presence of a broadband
      disturbance source
  6.4 Coexistence - Slot allocation
  6.5 Coexistence - Frequency allocation
  6.6 System Join Process
  6.7 Throughput
  6.8 Hidden Node Situation
History

Applies to PLT modems (Access and Inhouse), in which the coexistence mechanisms are at least partly implemented.

Committee
PLT
DocumentType
Standard
Pages
21
PublisherName
European Telecommunications Standards Institute
Status
Current

IEC 61000-4-4 : 3.0EN+(REDLINE+VERSION) ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-4: TESTING AND MEASUREMENT TECHNIQUES - ELECTRICAL FAST TRANSIENT/BURST IMMUNITY TEST

View more information
US$17.97
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.