TR 183 056 : 2.1.1
Current
The latest, up-to-date edition.
Hardcopy , PDF
English
Intellectual Property Rights
Foreword
Introduction
1 Scope
2 References
2.1 Normative references
2.2 Informative references
3 Definitions and abbreviations
3.1 Definitions
3.2 Abbreviations
4 Requirements and Issues
4.1 Requirements
4.2 Issues
5 Overview of technical solutions
5.1 General
5.2 Mechanisms for the Reduction of Signalling Load
5.3 Routeing Methods for Transmitting SIP networks
5.4 Interworking
5.5 Impacts on other interfaces/nodes in the IMS network
6 Comparison of solutions
6.1 Comparison of Signalling load reductions mechanisms
6.2 Comparison of Routeing mechanisms for Transmitting SIP
networks
6.3 Comparison of mechanisms for interworking towards
networks not supporting overlap signalling
6.4 Impacts of inter-working between In-Dialog and Multi-INVITE
overlap methods
7 Final Conclusion
Annex A: (network option): Call ID extended Overlap Dialling
Procedures
A.1 Actions at the originating VGW/AGCF
A.2 Actions at the terminating VGW/AGCF
A.3 Timers
Annex B: Example calculation for signalling load reduction as
achieved by different proposals
History
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.