• There are no items in your cart

11/30245953 DC : 0

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

BS IEC 60987 - NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - HARDWARE DESIGN REQUIREMENTS FOR COMPUTERBASED SYSTEMS

Available format(s)

Hardcopy , PDF

Superseded date

04-30-2015

Language(s)

English

BS IEC 60987.

Committee
NCE/8
DocumentType
Draft
Pages
12
PublisherName
British Standards Institution
Status
Superseded
SupersededBy

ISO 3951-1:2013 Sampling procedures for inspection by variables — Part 1: Specification for single sampling plans indexed by acceptance quality limit (AQL) for lot-by-lot inspection for a single quality characteristic and a single AQL
ISO 3951-2:2013 Sampling procedures for inspection by variables — Part 2: General specification for single sampling plans indexed by acceptance quality limit (AQL) for lot-by-lot inspection of independent quality characteristics

View more information

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.