AISC QC001 : 2002
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
AISC CERTIFICATION PROGRAM FOR STRUCTURAL STEEL FABRICATORS
07-23-2013
01-12-2013
1. Purpose
2. Scope
3. References
4. Definitions
5. Management Responsibility
5.1 Commitment (Policy)
5.2 Direction and Leadership
5.3 Management Representative
5.4 Resources
5.5 Internal Communication
5.6 Documentation Requirements
6. Contract and Project Specification Review
and Communication
7. Detailing
7.1 Detailing Procedures
7.2 Detailing Function Resources
8. Document and Data Control
8.1 Review and Approval
8.2 Customer Requirements
8.3 Revision Control
8.4 Access
8.5 Obsolescence and Transmittal
9. Control of Quality Records
10. Purchasing
10.1 Purchasing Data
10.2 Selection of Subcontractors
10.3 Verification of Purchased Product, Materials
and Services
10.4 Customer Verification of Fabricated Product
10.5 Control of Customer-Supplied Material
11. Material Identification
12. Fabrication Process Control
12.1 Welding
12.2 Bolt installation
12.3 Material Preparation for Application of Coatings
12.4 Coating Application
12.5 Equipment Maintenance
13. Inspection and Testing
13.1 Assignment of QC Inspections and Monitoring
13.2 Inspection Procedure
14. Calibration of Inspection, Measuring and Test Equipment
15. Control of Nonconformances
16. Corrective Action
17. Handling, Storage and Delivery of Product and Materials
18. Training
19. Internal Audit
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.