• There are no items in your cart

AS 1554.3-1983

Superseded
Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

Structural steel welding (known as the SAA Structural Steel Welding Code) - Welding of reinforcing steel
Available format(s)

Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Superseded date

06-30-2017

Language(s)

English

Published date

08-08-1983

Preview

1 - AS 1554 Part 3-1983 SAA STRUCTURAL STEEL WELDING CODE - WELDING OF REINFORCING STEEL
4 - PREFACE
5 - CONTENTS
6 - SECTION 1. SCOPE AND GENERAL
6 - 1.1 SCOPE.
6 - 1.2 APPLICATION.
6 - 1.3 REFERENCED DOCUMENTS.
6 - 1.4 DEFINITIONS.
6 - 1.4.1 Approved
6 - 1.4.2 Contractor
6 - 1.4.3 Contract drawings
6 - 1.4.4 Designer
6 - 1.4.5 Direct butt splice
6 - 1.4.6 Double lap splice
6 - 1.4.7 Indirect butt splice
6 - 1.4.8 Principal
6 - 1.4.9 Reinforcing steel
6 - 1.4.10 Single lap splice
6 - 1.4.11 Specification
6 - 1.4.12 Supervising Engineer
6 - 1.4.13 Tack weld
6 - 1.5 WELDING SYMBOLS.
6 - 1.6 WELDING OF REINFORCING STEEL.
6 - 1.6.1 Approval and Type of Welding.
6 - 1.6.2 Limitations on Welding.
6 - 1.6.3 Welding Different Grades of Reinforcing Steels
7 - 1.7 JOINING REINFORCING STEEL TO STRUCTURES
7 - 1.8 WELDING PROCESSES.
7 - 1.9 WELDING EQUIPMENT.
7 - 1.9.1 Compliance with Standards.
7 - 1.9.2 Safety Precautions.
8 - SECTION 2. MATERIALS OF CONSTRUCTION
8 - 2.1 PARENT MATERIAL.
8 - 2.2 BACKING MATERIAL.
8 - 2.3 WELDING CONSUMABLES.
8 - 2.3.1 Electrodes and Filler Wires.
8 - 2.3.2 Storage of Welding Consumables.
9 - SECTION 3. DETAILS OF FUSION WELDED CONNECTIONS
9 - 3.1 GENERAL.
9 - 3.1.1 Types of Fusion Welded Connections.
9 - 3.1.2 Design Throat Thickness.
9 - 3.1.3 Throat Size of Weld.
9 - 3.1.4 Effective Length.
9 - 3.1.5 Finished Width.
9 - 3.1.6 Effective Area.
9 - 3.2 BUTT SPLICES.
9 - 3.2.1 Direct Butt Splices.
9 - 3.2.2 Indirect Butt Splices.
9 - 3.3 LAP SPLICES.
9 - 3.4 TACK WELDS.
9 - 3.4.1 Limitations on Tack Welds.
9 - 3.4.2 Size of a Tack Weld.
10 - SECTION 4. QUALIFICATION OF WELDING PROCEDURES AND WELDING PERSONNEL FOR FUSION WELDING
10 - 4.1 QUALIFICATION OF WELDING PROCEDURE
10 - 4.2 METHOD OF QUALIFICATION OF WELDING PROCEDURE
10 - 4.3 PREQUALIFIED WELDING PROCEDURES.
10 - 4.4 PREQUALIFIED JOINT PREPARATIONS.
10 - 4.4.1 General.
10 - 4.4.2 Prequalified Butt Splices.
10 - 4.4.3 Prequalified Lap Splices.
10 - 4.5 QUALIFICATION OF WELDING CONSUMABLES.
10 - 4.5.1 Prequalified Welding Consumables.
10 - 4.5.2 Qualification of Welding Consumables by Testing
10 - 4.6 REQUALIFICATION OF FUSION WELDING PROCEDURES.
10 - 4.6.1 Changes in Essential Variables Necessitating Requalification of Welding Procedure.
10 - 4.6.2 Minor Changes Necessitating Requalification of Welding Procedure by Mactro Test
10 - 4.7 QUALIFICATION OF WELDING PERSONNEL.
10 - 4.7.1 Welding Supervisor.
11 - 4.7.2 Welders.
11 - 4.8 WORKMANSHIP.
11 - 4.8.1 Preparation of Material for Welding.
11 - 4.8.2 Assembly.
11 - 4.8.3 Gouging.
11 - 4.8.4 Positioning of Work.
11 - 4.8.5 Welding in Adverse Weather Conditions.
11 - 4.8.6 Preheat Temperature.
11 - 4.8.7 Correction of Defective Welds.
20 - SECTION 5. FLASH BUTT WELDING
20 - 5.1 GENERAL.
20 - 5.2 SIZES.
20 - 5.3 BAR PREPARATION.
20 - 5.4 ALIGNMENT.
20 - 5.5 CLEANLINESS.
20 - 5.6 WORKMANSHIP.
20 - 5.6.1 Overhang or Projection from the Dies.
20 - 5.6.2 Clamping Force.
20 - 5.6.3 Preheating.
20 - 5.6.4 Flashing.
20 - 5.6.5 Upsetting.
20 - 5.7 EQUIPMENT.
20 - 5.7.1 General.
20 - 5.7.2 Machine Controls.
20 - 5.7.3 Flash Guards.
20 - 5.7.4 Cleanliness of Machine.
20 - 5.8 QUALIFICATION OF WELDING PROCEDURE.
20 - 5.8.1 General.
20 - 5.8.2 Method of Qualification of Welding Procedure
20 - 5.8.3 Requalification of Flash Butt Welding Procedure
21 - 5.9 PRODUCTION CONTROL TESTS.
21 - 5.9.1 General Production Control Tests.
21 - 5.9.2 Frequency of Tests.
21 - 5.10 DEFECTIVE WELDS.
22 - SECTION 6. FLAME PRESSURE WELDING
22 - 6.1 GENERAL.
22 - 6.2 SIZES.
22 - 6.3 BAR PREPARATION.
22 - 6.4 ALIGNMENT.
22 - 6.5 CLEANLINESS.
22 - 6.6 WORKMANSHIP.
22 - 6.6.1 Positioning.
22 - 6.6.2 Clamping Force.
22 - 6.6.3 Upset.
22 - 6.7 QUALIFICATION OF WELDING PROCEDURE.
22 - 6.7.1 General.
22 - 6.7.2 Method of Qualification of Welding Procedure
22 - 6.7.3 Requalification of Gas Pressure Welding Procedures
22 - 6.8 PRODUCTION CONTROL TESTS.
22 - 6.9 DEFECTIVE WELDS.
23 - SECTION 7. QUALIFICATION OF WELDING PROCEDURE BY TESTING
23 - 7.1 GENERAL.
23 - 7.2 METHOD OF QUALIFICATION.
23 - 7.3 TESTS.
23 - 7.3.1 Macro Test.
23 - 7.3.2 Tensile Test.
23 - 7.3.3 Bend Test.
23 - 7.4 RETESTS.
24 - SECTION 8. TEST REQUIREMENTS
24 - 8.1 PRODUCTION CONTROL TEST REQUIREMENTS
24 - 8.2 MACRO TEST REQUIREMENTS.
24 - 8.3 TENSILE TEST REQUIREMENTS.
24 - 8.4 BEND TEST REQUIREMENTS.
25 - SECTION 9. INSPECTION
25 - 9.1 EXAMINATION OF WELDING.
25 - 9.2 QUALIFICATIONS OF INSPECTORS.
25 - 9.3 PRIVILEGES OF INSPECTORS.
25 - 9.4 INSPECTION OF WELDERS.
25 - 9.5 INSPECTION OF WORK.
25 - 9.5.1 Inspection Prior To and During Welding.
25 - 9.6 INSPECTION AFTER WELDING.
26 - APPENDIX A - CHECK LIST OF MATTERS FOR DISCUSSION
27 - APPENDIX B - RECOMMENDED METHOD FOR JOINT AND PROCESS IDENTIFICATION
27 - B1 PREQUALIFIED JOINT IDENTIFICATION.
27 - B2 PROCESS IDENTIFICATION.
27 - B3 EXAMPLE.
28 - APPENDIX C - A SUITABLE FORM OF WELDING PROCEDURE SHEET
29 - ANNEX - LIST OF REFERENCED DOCUMENTS

Covers welding of reinforcement intended to form part of concrete constructions designed and constructed in accordance with AS 1480 and AS 1481. Includes welding of high-strength steel reinforcing bars specified in AS 1302. It deals with metal arc, flash butt, and gas pressure welding, in the field or in the shop, of steel bar splices, steel construction devices, inserts, anchors and anchor details, including prefabricated assemblies. Connection by butt or fillet welds of reinforcing bar to steel plate and sections is also covered. Qualification procedures and tests of welders are included.

This standard sets out requirements for materials of construction, prequalified weld preparations, methods for the qualification of welding procedures and welding personnel, together with workmanship and inspection requirements for the welding of reinforcing steel in concrete structures designed and constructed in accordance with AS 1480 and AS 1481.It is intended for the welding of reinforcing steel complying with AS 1302, AS 1303 and AS 1304, but applies also to the welding of steel connection devices, inserts, anchors and anchor details, including prefabricated assemblies required in reinforced concrete and precast concrete constructions, in the fabrication shop and in the field.NOTE: Appendix A gives a list of matters of a contractual nature which might need to be finalized between the principal and the contractor.

Committee
WD-003
DocumentType
Standard
ISBN
0 7262 3063 4
Pages
24
PublisherName
Standards Australia
Status
Superseded
SupersededBy
Supersedes

Under Revision see DR 00266

AS/NZS 4671:2001 Steel reinforcing materials
AS 4065-1992 Concrete poles for overhead lines and street lighting
AS 3600-2001 Concrete structures
AS 1796-1993 Certification of welders and welding supervisors
AS 3600-1994 Concrete structures
AS 3533.1-1997 Amusement rides and devices - Design and construction
AS/NZS 4291.1:1995 Mechanical properties of fasteners Bolts, screws and studs
AS 2214-1994 Certification of welding supervisors - Structural steel welding
AS 2359.1-1995 Powered industrial trucks - General requirements

View more information
US$60.92
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.