• There are no items in your cart

AS 2988-1987

Current
Current

The latest, up-to-date edition.

Form of formal instrument of agreement. Together with General conditions of contract for the supply of equipment with or without installation (AS 2987-1987)
Available format(s)

Hardcopy Pad of Form , PDF 1 User Pad of Form , Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English

Published date

10-05-1987

Preview

1 - AS 2987-1987 GENERAL CONDITIONS OF CONTRACT FOR THE SUPPLY OF EQUIPMENT WITH OR WITHOUT INSTALLATION WITH AS 2988-1987
4 - PREFACE
5 - CONTENTS
6 - 1 CONSTRUCTION OF CONTRACT
6 - 2 INTERPRETATION
8 - 3 NATURE OF CONTRACT
8 - 3.1 Performance and Payment
8 - 3.2 Quantities
8 - 3.3 Omitted Items
8 - 4 MATERIALS AND WORK
8 - 5 SECURITY AND RETENTION MONEYS
8 - 5.1 Purpose
8 - 5.2 Provision of Security
8 - 5.3 Form of Security
8 - 5.4 Time for Lodgement of Security
8 - 5.5 Conversion of Security
9 - *5.6 Substitution of Security for Retention Moneys
9 - *5.7 Reduction of Security and Retention Moneys
9 - 5.8 Release of Security
9 - 5.9 Interest on Security and Retention Moneys
9 - 6 EVIDENCE OF CONTRACT
9 - 6.1 Contract in Absence of Formal Instrument of Agreement
9 - 6.2 Formal Instrument of Agreement
9 - 7 SERVICE OF NOTICES
10 - 8 CONTRACT DOCUMENTS
10 - 8.1 Discrepancies
10 - 8.2 Dimensions
10 - 8.3 Supply of Documents by Purchaser and Engineer
10 - 8.4 Supply of Documents by Contractor
10 - 8.5 Availability of Documents
10 - 8.6 Confidential Information
11 - 9 ASSIGNMENT AND SUBCONTRACTING
11 - 9.1 Assignment
11 - 9.2 Subcontracting
11 - 9.3 Contractor’s Responsibility
11 - 10 DESIGNATED, SELECTED AND NOMINATED SUBCONTRACTORS
11 - 10.1 Definitions
11 - 10.2 Designated Subcontract
11 - 10.3 Selected Subcontract
12 - 10.4 Nominated Subcontract
12 - 10.5 Provisions applying generally to Designated, Selected and Nominated Subcontract Work
13 - *10.6 Direct Payment of Designated or Nominated Subcontractors
13 - 10.7 Termination of Designated and Nominated Subcontracts
13 - 11 PROVISIONAL SUMS
13 - 12 LATENT CONDITIONS
13 - 12.1 Definition
13 - 12.2 Notification
14 - 12.3 Extension of Time and Costs
14 - 12.4 Time Bar
14 - 13 PATENTS, COPYRIGHT AND OTHER INTELLECTUAL PROPERTY RIGHTS
14 - 14 STATUTORY REQUIREMENTS
14 - 14.1 Complying with Statutory Requirements
14 - *14.2 Payment where there is no variation
14 - 14.3 Notices and Fees
15 - 14.4 Documents Evidencing Approvals of Authorities
15 - 15 PROTECTION OF PEOPLE AND PROPERTY
15 - 16 INSURANCE
15 - 16.1 Insurance of Equipment and Work
15 - 16.2 Public Liability Insurance
15 - 16.3 Insurance of Employees
16 - 16.4 Insurance Generally
16 - 17 PROGRESS, SUSPENSION, ACCESS AND CLEANING UP
16 - 17.1 Rate of Progress
16 - 17.2 Contract Program
16 - 17.3 Suspension by Engineer
16 - 17.4 Suspension by Contractor
17 - 17.5 Recommencement of Work
17 - 17.6 Cost of Suspension
17 - 17.7 Effect of Suspension
17 - 17.8 Access and Cleaning Up
17 - 18 ENGINEER AND ENGINEER’S REPRESENTATIVES
17 - 18.1 Engineer
17 - 18.2 Engineer’s Representatives
18 - 19 CONTRACTOR’S REPRESENTATIVE
18 - 20 VARIATIONS
18 - 20.1 Variations to the Work
18 - 20.2 Valuation
18 - 21 DELIVERY AND PRACTICAL COMPLETION
18 - 21.1 Time for Delivery and Liquidated Damages
19 - 21.2 Time for Practical Completion and Liquidated Damages
19 - 21.3 Reduction of Liquidated Damages for Part of the Equipment Capable of Use
19 - 21.4 Creation of Separable Portions
19 - 22 EXTENSIONS OF TIME
20 - 23 ACCEPTANCE OR REJECTION OF EQUIPMENT
20 - 23.1 Certificate of Acceptance or Advice of Non-Acceptance
21 - 23.2 Contractor to Advise Action in Case of Non-acceptance
21 - 23.3 Purchaser’s Decision on Contractor’s Proposals
21 - 23.4 Replacement or Correction by Contractor
21 - 23.5 Removal of Rejected Equipment
21 - 23.6 Purchaser Accepts Equipment and Damages
21 - 23.7 Purchaser’s Right to Use Equipment
22 - 24 DEFECTS LIABILITY
22 - 25 EXAMINATION AND TESTING
22 - 25.1 Engineer May Order Tests
22 - 25.2 Covering Up of Work
22 - 25.3 Who Conducts Tests
22 - 25.4 Notice of Tests
22 - 25.5 Procedure if Tests Delayed
22 - 25.6 Results of Tests
22 - 25.7 Costs of Testing
23 - 26 PAYMENT
23 - 26.1 Payment Claims, Payment Certificates and Time for Payment
23 - 26.2 The Calculation of Payment
23 - 26.3 Retention Moneys
23 - 26.4 Set Offs by the Purchaser
23 - 26.5 Protection of Purchaser’s Interest
24 - 27 INTEREST ON OVERDUE PAYMENTS
24 - 28 FINAL PAYMENT CLAIM AND FINAL PAYMENT CERTIFICATE
24 - 29 PAYMENT OF WORKERS AND SUBCONTRACTORS
25 - 30 DEFAULT OR INSOLVENCY
25 - 30.1 Preservation of other Rights
25 - 30.2 Default by the Contractor
25 - 30.3 Requirements of a Notice by the Purchaser to Show Cause
25 - 30.4 Rights of Purchaser
25 - 30.5 Procedure when the Purchaser Takes Over Work
25 - 30.6 Adjustment on Completion of the Work Taken Out of the Hands of the Contractor
26 - 30.7 Default of the Purchaser
26 - 30.8 Requirements of a Notice by the Contractor to Show Cause
26 - 30.9 Rights of Contractor
26 - 30.10 Rights of the Parties on Termination
26 - 30.11 Insolvency
27 - 31 DISPUTES
27 - 31.1 Submission to the Engineer
27 - 31.2 Arbitration
27 - *32 LIMITATION OF LIABILITY
27 - 32.1 Care of Equipment
27 - 32.2 Proprietary Items
28 - 32.3 General Limitations of Liability
28 - 33 SERVICES AND FACILITIES.
36 - INDEX - CONDITIONS OF CONTRACT
39 - AS 2988-1987 FORM OF FORMAL INSTRUMENT OF AGREEMENT
40 - AMENDMENT CONTROL SHEET

This Publication includes AS 2987, General conditions of contract for the supply of equipment with or without installation, and the form of formal instrument of agreement for use with AS 2987—1987.

Committee
MB-010
DocumentType
Standard
ISBN
0 7262 4726 X
Pages
33
PublisherName
Standards Australia
Status
Current
Supersedes

Under Revision See DR 93136 AS 2987 first published as part of AS CB16 1957. AS CB16-1957 revised and redesignated in part as AS CZ20-1970 and AS CZ21-1973 AS CZ20-1970 and AS CZ21-1973 revised, amalgamated and redesignated AS 2987 1987. Reissued incorporating Amendment No. 1 (February 1998) and Amendment No. 2 (October 2000). AS 2988 first published as part of AS CB16 1957. AS CB16-1957 revised and redesignated in part as AS CZ24-1970. AS CZ24-1970 revised and redesignated AS 2988 1987

View more information
US$82.57
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.