ANSI/IEC/ASQ D61070:1997
Current
The latest, up-to-date edition.
Compliance Test Procedures For Steady-state Availability
Hardcopy , PDF
English
09-16-1997
ForewordIntroduction1 Scope2 Normative references3 Definitions4 Symbols 5 Conditions for availability performance testing 5.1 Dependability management and specification 5.2 Statistical process conditions 5.3 Definition of states 5.4 Classification of times 5.5 Classification of failures 5.6 Test conditions6 Data collection7 Time distributions 7.1 Distribution assumptions 7.2 Trend test 7.3 Decision alternatives in case of non-validity of assumptions8 Compliance testing planning9 Compliance test plans 9.1 Test plan 1-Fixed number of failures 9.2 Test plan 2-Fixed time longer than 15 mean up times 9.3 Test plan 3-Fixed time (U < 0.05) 9.4 Test plan 4-Sequential test10 Test report 10.1 Test logs and data records 10.2 Failure reports 10.3 Failure summary record 10.4 Replacement units and spare parts inventory (optional) 10.5 Final reportAnnexes A Tables A.1 to A.4B Numerical examplesC Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.