IEC 61000-4-8 : 2.0
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-8: TESTING AND MEASUREMENT TECHNIQUES - POWER FREQUENCY MAGNETIC FIELD IMMUNITY TEST
|
IEC 61000-4-10 : 2.0
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-10: TESTING AND MEASUREMENT TECHNIQUES - DAMPED OSCILLATORY MAGNETIC FIELD IMMUNITY TEST
|
IEC 60255-22-1:2007
|
Measuring relays and protection equipment - Part 22-1: Electrical disturbance tests - 1 MHz burst immunity tests
|
IEEE 62-1995
|
IEEE Guide for Diagnostic Field Testing of Electric Power Apparatus - Part 1: Oil Filled Power Transformers, Regulators, and Reactors
|
IEC 61000-4-11:2004+AMD1:2017 CSV
|
Electromagnetic compatibility (EMC) - Part 4-11: Testing and measurement techniques - Voltage dips, short interruptions and voltage variations immunity tests
|
IEC 61000-4-8:2009
|
Electromagnetic compatibility (EMC) - Part 4-8: Testing and measurement techniques - Power frequency magnetic field immunity test
|
IEEE C57.12.00-2015
|
IEEE Standard for General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers
|
IEEE C57.19.00 : 2004
|
GENERAL REQUIREMENTS AND TEST PROCEDURE FOR POWER APPARATUS BUSHINGS
|
IEEE C57.91-2011 REDLINE
|
IEEE Guide for Loading Mineral-Oil-Immersed Transformers and Step-Voltage Regulators
|
IEC 60255-22-5:2008
|
Measuring relays and protection equipment - Part 22-5: Electrical disturbance tests - Surge immunity test
|
IEC 60076-4:1976
|
Power transformers - Part 4: Tappings and connections
|
IEEE C57.12.90-2010
|
IEEE Standard Test Code for Liquid-Immersed Distribution, Power, and Regulating Transformers
|
IEEE 4-2013
|
IEEE Standard for High-Voltage Testing Techniques
|
IEEE 315 : 1975
|
GRAPHIC SYMBOLS FOR ELECTRICAL AND ELECTRONICS DIAGRAMS (INCLUDING REFERENCE DESIGNATION LETTERS)
|
IEC 61000-4-9 : 2.0
|
ELECTROMAGNETIC COMPATIBILITY (EMC) - PART 4-9: TESTING AND MEASUREMENT TECHNIQUES - IMPULSE MAGNETIC FIELD IMMUNITY TEST
|
IEEE C37.90.3-2001
|
IEEE Standard Electrostatic Discharge Tests for Protective Relays
|
IEEE C57.104-2008
|
IEEE Guide for the Interpretation of Gases Generated in Oil-Immersed Transformers
|
IEEE C57.98-2011
|
IEEE Guide for Transformer Impulse Tests
|
ANSI C84.1 : 2016
|
ELECTRIC POWER SYSTEMS AND EQUIPMENT - VOLTAGE RATINGS (60 HERTZ)
|
IEEE C2-2017
|
NATIONAL ELECTRICAL SAFETY CODE (NESC)(R)
|
IEC 60255-22-6:2001
|
Electrical relays - Part 22-6: Electrical disturbance tests for measuring relays and protection equipment - Immunity to conducted disturbances induced by radio frequency fields
|
IEC 60255-22-3:2007
|
Measuring relays and protection equipment - Part 22-3: Electrical disturbance tests - Radiated electromagnetic field immunity
|
IEC 60068-2-2:2007
|
Environmental testing - Part 2-2: Tests - Test B: Dry heat
|
IEEE C37.90.2:2004
|
WITHSTAND CAPABILITY OF RELAY SYSTEMS TO RADIATED ELECTROMAGNETIC INTERFERENCE FROM TRANSCEIVERS
|
IEC 60255-5:2000
|
Electrical Relays - Part 5: Insulation coordination for measuring relays and protection equipment - Requirements and tests
|
IEEE C57.12.20-2011 REDLINE
|
IEEE Standard for Overhead-Type Distribution Transformers 500 kVA and Smaller: High Voltage, 34 500 V and Below; Low Voltage, 7970/13 800Y V and Below
|
IEEE C37.90.1-2012
|
IEEE Standard for Surge Withstand Capability (SWC) Tests for Relays and Relay Systems Associated with Electric Power Apparatus
|
IEC 60255-22-2:2008
|
Measuring relays and protection equipment - Part 22-2: Electrical disturbance tests - Electrostatic discharge tests
|
IEC 60255-21-1:1988
|
Electrical relays - Part 21: Vibration, shock, bump and seismic tests on measuring relays and protection equipment - Section One: Vibration tests (sinusoidal)
|
IEEE C57.12.31-2010
|
IEEE Standard for Pole-Mounted Equipment--Enclosure Integrity
|
IEC 60068-2-1:2007
|
Environmental testing - Part 2-1: Tests - Test A: Cold
|
IEEE C57.106-2006
|
IEEE Guide for Acceptance and Maintenance of Insulating Oil in Equipment
|
IEC 60214-2:2004
|
Tap-changers - Part 2: Application guide
|
IEC 60214-1:2014
|
Tap-changers - Part 1: Performance requirements and test methods
|
IEC 60255-22-4:2008
|
Measuring relays and protection equipment - Part 22-4: Electrical disturbance tests - Electrical fast transient/burst immunity test
|
IEEE C57.131-2012
|
IEEE Standard Requirements for Tap Changers
|
IEC 60068-2-30:2005
|
Environmental testing - Part 2-30: Tests - Test Db: Damp heat, cyclic (12 h + 12 h cycle)
|