BS IEC 62117:1999
Current
The latest, up-to-date edition.
Nuclear reactor instrumentation. Pressurized light water reactors (PWR). Monitoring adequate cooling within the core during cold shutdown.
Hardcopy , PDF
English
02-15-2000
Gives requirements for instrumentation to monitor core cooling for safe operation of PWRs during cold shutdown operations when the coolant temperature is below 100 °C. Summarizes good international practices to be used when designing new or upgrading existing PWR core cooling monitors.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.