• There are no items in your cart

DEFSTAN 02-125/4(2015) : 2015

Current

Current

The latest, up-to-date edition.

REQUIREMENTS FOR NAAFI COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

07-08-2015

Foreword
1 Scope
2 Warning
3 Related Documents
4 Design Requirements
5 Beer Store - HM Surface Ships
6 Beer Issue Centre - HM Surface Ships
7 Canteen/Gift Shop - HM Surface Ships
8 Canteen Store - HM Surface Ships
9 Vending Machines
10 Other Facilities
11 Drawings
Annex A - Normative References
Annex B - Abbreviations and Definitions

Describes the requirements for the design and fitting out of compartments in HM Surface Ships normally administered by NAAFI personnel and compartments in Nuclear Submarines specifically for NAAFI merchandise.

DevelopmentNote
Supersedes DEFSTAN 02-125/3(2010). (08/2015)
DocumentType
Standard
Pages
24
PublisherName
UK Ministry of Defence Standards
Status
Current
Supersedes

DEFSTAN 02-126(PT1)/3(2010) : 2010 REQUIREMENTS FOR STORES COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS
DEFSTAN 05-10(PT2)/6(2013) : 2013 PRODUCT DEFINITION INFORMATION - PART 2: DIGITAL PRODUCT DEFINITION INFORMATION
DEFSTAN 02-126(PT2)/3(2010) : 2010 REQUIREMENTS FOR STORES COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES - PART 2: SPECIFIC REQUIREMENTS HM SURFACE SHIPS
DEFSTAN 08-160/1(2003) : 2003 REQUIREMENTS FOR ELECTRICAL INSTALLATIONS - CATEGORY 2
DEFSTAN 02-157(PT2)/2(2007) : 2007 REQUIREMENTS FOR DECK COVERINGS - PART 2: DECK PREPARATION AND LAYING PROCEDURES
DEFSTAN 02-157(PT1)/2(2007) : 2007 REQUIREMENTS FOR DECK COVERINGS - PART 1: GENERAL REQUIREMENTS
DEFSTAN 02-130/2(2012) : 2012 REQUIREMENTS FOR DECORATIVE LININGS AND COMPOSITE BULKHEADS
DEFSTAN 02-105(PT1)/3(2010) : 2010 REQUIREMENTS FOR FITTING OUT OF OFFICES (EXCLUDING OPERATIONAL/COMMUNICATION OFFICES) IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS
DEFSTAN 02-105(PT2)/3(2010) : 2010 REQUIREMENTS FOR FITTING OUT OF OFFICES (EXCLUDING OPERATIONAL/COMMUNICATION OFFICES) IN HM SURFACE SHIPS AND SUBMARINES - PART 2: SPECIFIC REQUIREMENTS HM SURFACE SHIPS
DEFSTAN 08-109/3(2009) : 2009 REQUIREMENTS FOR THE DESIGN OF LOW VOLTAGE SUPPLY AND DISTRIBUTION SYSTEMS IN HM SURFACE SHIPS AND NUCLEAR SUBMARINES
DEFSTAN 05-10(PT1)/6(2013) : 2013 PRODUCT DEFINITION INFORMATION - PART 1: HARDCOPY/MICROFORM PRODUCT DEFINITION INFORMATION
DEFSTAN 02-126(PT3)/3(2010) : 2010 REQUIREMENTS FOR STORES COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES - PART 3: SPECIFIC REQUIREMENTS HM SUBMARINES
DEFSTAN 02-102(PT1)/3(2005) : 2005 REQUIREMENTS FOR AIR-CONDITIONING AND VENTILATION - PART 1: HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES
DEFSTAN 02-587(PT1)/3(2008) : 2008 REQUIREMENTS FOR LIGHTING SYSTEMS - PART 1: SURFACE SHIPS
DEFSTAN 08-159(PT2)/1(2001) : 2001 REQUIREMENTS FOR AIR-CONDITIONING AND VENTILATION - PART 2: HM SUBMARINES
DEFSTAN 05-10(PT3)/6(2013) : 2013 PRODUCT DEFINITION INFORMATION - PART 3: PRODUCT DEFINITION INFORMATION GUIDANCE

View more information
Free

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.