• There are no items in your cart

DEFSTAN 05-101(PT1)/1(2005) : 2005

Current
Current

The latest, up-to-date edition.

PROOF OF ORDNANCE, MUNITIONS, ARMOUR AND EXPLOSIVES - PART 1: REQUIREMENTS
Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

05-20-2005

Foreword
Introduction
1 Scope
2 Warning
3 Normative References
4 Definitions
5 Abbreviations
6 Generic Proof Policy Requirements
   6.1 General
        6.1.1 Design Analysis
        6.1.2 Product Control
        6.1.3 Production Control
        6.1.4 Sampling Plans
        6.1.5 Design Trends
   6.2 Proof Schedule
        6.2.1 Proof Requirements
        6.2.2 Format
        6.2.3 Review of Proof Schedules
   6.3 Proof Sentencing/Records
   6.4 Proof Equipment
        6.4.1 Contracts Where Proof Arrangements Already Defined
        6.4.2 Contracts Where Proof Arrangements Not Already
               Defined
        6.4.3 Custody and Issue of Proof Equipment Design Data
        6.4.4 Equipment Data Pack Reference
        6.4.4 In-Service Proof Equipment
7 Ordnance, Including Mortars, of Calibre greater than 51 mm
   7.1 General
   7.2 Proof Schedule
   7.3 Proof of Spares
   7.4 Conduct of Proof
   7.5 Preparation for Proof Firing
   7.6 Proof Data Requirements
   7.7 Proof Pressures
   7.8 Rounds to be Fired
   7.9 Projectiles
   7.10 Firing of Additional Rounds
   7.11 Proof Markings
   7.12 Variations and Exceptions
   7.13 Submission for Reproof
8 Small Arms and Cannon
   8.1 Small Arms
   8.2 Hazard Assessment/Proof Schedule
   8.3 Conduct of Proof
   8.4 Proof Marking
9 Munitions (Less Guided Weapons And Rockets) Proof Policy
   9.1 General
   9.2 Small Arms Ammunition (SAA)
   9.3 Grenades
   9.4 Mortar Ammunition
   9.5 Bombs
   9.6 Sub-Munitions
   9.7 Fuzes
   9.8 Propellant
10 Guided Weapons (GW) and Rockets
   10.1 General
   10.2 Proof Schedules for GW/Rocket Sub-Systems
11 Armour and Armours Containing Explosive Material, Proof Policy
   11.1 Armour Supplier
   11.2 System Performance and Test Plan
   11.3 Armour Material Specification and Properties
        11.3.1 Material Specification
        11.3.2 Armour Properties
        11.3.3 Ballistic Sampling Rate
   11.4 Provision of Evidence for Material and System Acceptance
        11.4.1 Certification in Advance of Supply
        11.4.2 Certification of Supply
12 Mines, Demolitions, Explosives and Pyrotechnics
   12.1 Genera
   12.2 Mines
   12.3 Pyrotechnics
        12.3.1 Proof of Safety of Life at Sea and Life
               Saving Stores
13 Tri-Service In-Service Surveillance Proof Policy
   13.1 Surveillance Plan
   13.2 Results and Analysis of In-Service Surveillance
   13.3 In-Service Failures and Defects
Annex A - Format of a Proof Schedule
   A.1 Proof Requirements
   A.2 Proof Sample
        A.2.1 Size
        A.2.2 Scheme
   A.3 Accept/Reject Criteria
   A.4 Lotting
   A.5 Proof Sample Selection
   A.6 Proof Equipment Control
   A.7 Conduct of Proof
   A.8 Recording Proof Results
        A.8.1 Proof Papers
   A.9 Evaluation Results
   A.10 Sentencing
   A.11 Sentencing Authority
Annex B - Service Ordnance Proof Pressures
Annex C - Charges to be Fired at Proof of Ordnance or
          Associated Parts

Specifies generic proof policy and requirements applicable to all weapons, munitions and other explosive related components.

DevelopmentNote
Supersedes DEFSTAN 05-61(PT11)/2(1992), DEFSTAN 05-61(PT13)/1(1994), DEFSTAN 05-61(PT14)/1(1994), DEFSTAN 05-61(PT17)/1(1992) and DEFSTAN 13-92/3(1996). (05/2005)
DocumentType
Standard
Pages
38
PublisherName
UK Ministry of Defence Standards
Status
Current
Supersedes

DEFSTAN 07-85(PT4)/1(2006) : 2006 DESIGN REQUIREMENTS FOR WEAPONS AND ASSOCIATED SYSTEMS - PART 4: TEST PROCEDURES
DEFSTAN 02-323/3(2009) : 2009 REQUIREMENTS FOR CENTRIFUGES

AOP 38 : 2006 SPECIALIST GLOSSARY OF TERMS AND DEFINITIONS ON AMMUNITION SAFETY
STANAG 4224 : 2007 LARGE CALIBRE ARTILLERY AND NAVAL GUN AMMUNITION GREATER THAN 40 MM, SAFETY AND SUITABILITY FOR SERVICE EVALUATION
BS EN ISO 9001:2015 Quality management systems. Requirements
STANAG 4187 : 2007 FUZING SYSTEMS - SAFETY DESIGN REQUIREMENTS
DEFSTAN 13-36(PT8)/1(1991) : INTERIM BALLISTIC STANDARDIZATION OF GUN AMMUNITION - PART 8: CRUSHERS AND CRUSHER GAUGES
STANAG 4157 : 2017 SAFETY, ARMING AND FUNCTIONING SYSTEMS (SAF SYSTEMS) TESTING REQUIREMENTS
DEFSTAN 05-61(PT2)/1(1983) : 1983 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 2: GOVERNMENT SURPLUS MATERIEL - REQUIREMENTS GOVERNING THE USE OR SUPPLY OF SUCH MATERIEL BY CONTRACTORS
DEFSTAN 13-92/3(1996) : 1996 MANUFACTURE, INSPECTION AND PROOF OF ORDNANCE OF 20 MM CALIBRE AND OVER
AAP-6 : 2016 NATO GLOSSARY OF TERMS AND DEFINITIONS (ENGLISH AND FRENCH)
DEFSTAN 05-61(PT1)/4(2004) : 2004 QUALITY ASSURANCE PROCEDURAL REQUIREMENTS - PART 1: CONCESSIONS
BS 4778-2:1991 Quality vocabulary Quality concepts and related definitions
BS 3811:1993 Glossary of terms used in terotechnology
DEFSTAN 05-10/4(1990) : 1990 DRAWING PROCEDURE
BS 4778-3.1:1991 Quality vocabulary. Availability, reliability and maintainability terms Guide to concepts and related definitions
STANAG 4493 : 2007 TANK AMMUNITION, SAFETY AND SUITABILITY FOR SERVICE EVALUATION
STANAG 4519 : 0 GAS GENERATORS, DESIGN SAFETY PRINCIPLES AND SAFETY AND SUITABILITY FOR SERVICE EVALUATION
DEFSTAN 13-96(PT1)/3(1994) : 1994 LOTTING AND BATCHING OF AMMUNITION - PART 1: GENERAL REQUIREMENTS
STANAG 4225 : 0 THE SAFETY EVALUATION OF MORTAR BOMBS
STANAG 4110 : 2005 DEFINITIONS OF PRESSURE TERMS AND THEIR INTERRELATIONSHIP FOR USE IN THE DESIGN AND PROOF OF CANNONS OR MORTARS AND AMMUNITION
BS EN ISO 9000:2015 Quality management systems. Fundamentals and vocabulary
DEFSTAN 13-96(PT2)/5(1999) : 1999 LOTTING AND BATCHING OF AMMUNITION - PART 2: LAND SERVICE AMMUNITION
DEFSTAN 95-24/3(2004) : 2004 ARMOUR PLATE, STEEL (3-160 MM)

View more information
Free

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.