• There are no items in your cart

DEFSTAN 59-41(PT2)/4(1995) : 1995

Superseded
Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

ELECTROMAGNETIC COMPATIBILITY - MANAGEMENT AND PLANNING PROCEDURES
Superseded date

12-01-2002

Published date

01-12-2013

Preface
0 Scope
1 Management
2 Control plans
3 Test plans
4 Test reports
5 Test house records

Covers the management and planning procedures required to satisfy the MOD requirement for equipment electromagnetic compatibility (EMC).

DevelopmentNote
Supersedes DEFSTAN 59-41(PT2)/3(1988), DEFSTAN 59-41(PT2)/2(1986), DEFSTAN 59-41(PT2)/1(1979) & DEFSTAN 59-41(PT2)/1(1975) (08/2003)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy
Supersedes

DEFSTAN 59-41(PT5)/2(1998) : 1998
DEFSTAN 59-41(PT3)SEC1/1(1998) : INTERIM ELECTROMAGNETIC COMPATIBILITY - TECHNICAL REQUIREMENTS TEST METHODS AND LIMITS - MAN WORN, MAN PORTABLE EQUIPMENT
ANEP-45 : 0

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.