• There are no items in your cart

DR 00375

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

Bridge design Part 2: Design loads

Superseded date

06-30-2017

Published date

12-01-2000

Proposes minimum design loads, forces, load effects and load combinations for the design of concrete and steel bridges in limit states format, including pedestrian bridges and cycle ways.

CommentClosesDate
03-31-2001
Committee
BD-090
DocumentType
Draft
PublisherName
Standards Australia
Status
Superseded
SupersededBy

Revision of HB 77.2-1996. To be AS 5100.2

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.