• There are no items in your cart

EN 447:2007

Current
Current

The latest, up-to-date edition.

Grout for prestressing tendons - Basic requirements
Published date

10-03-2007

Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Materials
  4.1 Cement
  4.2 Water
  4.3 Admixtures
  4.4 Additions
5 Batching and mixing of grout
6 Properties of grout
  6.1 General
  6.2 Sieve test
  6.3 Fluidity
  6.4 Bleeding
  6.5 Volume change
  6.6 Strength
  6.7 Setting time
  6.8 Density
7 Evaluation of conformity
  7.1 Production control
  7.2 Initial type testing
  7.3 Audit testing
Bibliography

This European Standard covers the materials that may be used in the manufacture of cement grouts and the required properties and composition of the grout. It is applicable to grouting of tendons in all types of structures including bridges and buildings.

Committee
CEN/TC 104
DocumentType
Standard
PublisherName
Comite Europeen de Normalisation
Status
Current

Standards Relationship
NBN EN 447 : 2007 Identical
NF EN 447 : 2007 Identical
NEN EN 447 : 2007 Identical
NS EN 447 : 2ED 2007 Identical
I.S. EN 447:2007 Identical
PN EN 447 : 2009 Identical
SN EN 447 : 2007 Identical
UNI EN 447 : 2007 Identical
UNE-EN 447:2009 Identical
BS EN 447:2007 Identical
BS EN 446:2007 Similar to
BS EN 446:2007 Identical
BS EN 445:2007 Identical
DIN EN 447:2017-09 Identical

PREN 14199 : DRAFT 2013 EXECUTION OF SPECIAL GEOTECHNICAL WORK - MICROPILES
13/30280743 DC : 0 BS EN 14199 - EXECUTION OF SPECIAL GEOTECHNICAL WORK - MICROPILES
BS EN 14490:2010 Execution of special geotechnical works. Soil nailing
BS EN 445:2007 Grout for prestressing tendons. Test methods
DIN EN 1537:2001-01 EXECUTION OF SPECIAL GEOTECHNICAL WORKS - GROUND ANCHORS
I.S. EN 14199:2015 EXECUTION OF SPECIAL GEOTECHNICAL WORKS - MICROPILES
DIN EN 445:2008-01 Grout for prestressing tendons - Test methods
DIN EN 13670:2011-03 Execution of concrete structures
13/30280740 DC : 0 BS EN 12699 - EXECUTION OF SPECIAL GEOTECHNICAL WORK - DISPLACEMENT PILES
I.S. CWA 14646:2003 REQUIREMENTS FOR THE INSTALLATION OF POST-TENSIONING KITS FOR PRESTRESSING OF STRUCTURES AND QUALIFICATION OF THE SPECIALIST COMPANY AND ITS PERSONNEL
DIN EN 1537:2014-07 EXECUTION OF SPECIAL GEOTECHNICAL WORKS - GROUND ANCHORS
DIN EN 14199:2015-07 EXECUTION OF SPECIAL GEOTECHNICAL WORK - MICROPILES
DIN EN 1536:2015-10 EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES
I.S. EN 934-4:2009 ADMIXTURES FOR CONCRETE, MORTAR AND GROUT - PART 4: ADMIXTURES FOR GROUT FOR PRESTRESSING TENDONS - DEFINITIONS, REQUIREMENTS, CONFORMITY, MARKING AND LABELLING
I.S. EN 1536:2010 EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES
I.S. EN 1537:2013 EXECUTION OF SPECIAL GEOTECHNICAL WORKS - GROUND ANCHORS
I.S. EN 445:2007 GROUT FOR PRESTRESSING TENDONS - TEST METHODS
I.S. EN 446:2007 GROUT FOR PRESTRESSING TENDONS - GROUTING PROCEDURES
UNI EN 445 : 2007 GROUT FOR PRESTRESSING TENDONS - TEST METHODS
08/30180275 DC : 0 BS EN 934-4 - ADMIXTURES FOR CONCRETE, MORTAR AND GROUT - PART 4: ADMIXTURES FOR GROUT FOR PRESTRESSING TENDONS - DEFINITIONS, REQUIREMENTS, CONFORMITY, MARKING AND LABELLING
PREN 934-4 : DRAFT 2008 ADMIXTURES FOR CONCRETE, MORTAR AND GROUT - PART 4: ADMIXTURES FOR GROUT FOR PRESTRESSING TENDONS - DEFINITIONS, REQUIREMENTS, CONFORMITY, MARKING AND LABELLING
07/30172380 DC : 0 BS EN 14490 - EXECUTION OF SPECIAL GEOTECHNICAL WORKS - SOIL NAILING
DD ENV 13670-1:2000 Execution of concrete structures Common
PREN 12699 : DRAFT 2013 EXECUTION OF SPECIAL GEOTECHNICAL WORK - DISPLACEMENT PILES
DIN EN 934-4:2009-09 ADMIXTURES FOR CONCRETE, MORTAR AND GROUT - PART 4: ADMIXTURES FOR GROUT FOR PRESTRESSING TENDONS - DEFINITIONS, REQUIREMENTS, CONFORMITY, MARKING AND LABELLING
EEMUA 207 : 2009 DOUBLE CONCRETE TANKS FOR LIQUEFIED GAS - GUIDE TO DESIGN, CONSTRUCTION AND OPERATION
UNI EN 1537 : 2013 EXECUTION OF SPECIAL GEOTECHNICAL WORKS - GROUND ANCHORS
UNI EN 934-4 : 2009 ADMIXTURES FOR CONCRETE, MORTAR AND GROUT - PART 4: ADMIXTURES FOR GROUT FOR PRESTRESSING TENDONS - DEFINITIONS, REQUIREMENTS, CONFORMITY, MARKING AND LABELLING
UNI EN 446 : 2007 GROUT FOR PRESTRESSING TENDONS - GROUTING PROCEDURES
I.S. EN 13670:2009 EXECUTION OF CONCRETE STRUCTURES
05/30139293 DC : DRAFT SEP 2005 EN 446 - GROUT FOR PRESTRESSING TENDONS - GROUTING PROCEDURES
DIN EN 14490 E : 2010 EXECUTION OF SPECIAL GEOTECHNICAL WORKS - SOIL NAILING
UNI EN 14490 : 2010 EXECUTION OF SPECIAL GEOTECHNICAL WORKS - SOIL NAILING
I.S. EN 14490:2010 EXECUTION OF SPECIAL GEOTECHNICAL WORKS - SOIL NAILING
BS EN 446:2007 Grout for prestressing tendons. Grouting procedures
UNE-EN 934-4:2010 Admixtures for concrete, mortar and grout - Part 4: Admixtures for grout for prestressing tendons - Definitions, requirements, conformity, marking and labelling
BS EN 934-4:2009 Admixtures for concrete, mortar and grout Admixtures for grout for prestressing tendons. Definitions, requirements, conformity, marking and labelling
BS EN 1536 : 2010 EXECUTION OF SPECIAL GEOTECHNICAL WORK - BORED PILES
UNE-EN 13670:2013 Execution of concrete structures
DIN EN 446:2008-01 Grout for prestressing tendons - Grouting procedures
EN 1536:2010+A1:2015 Execution of special geotechnical work - Bored piles
EN 446:2007 Grout for prestressing tendons - Grouting procedures
EN 14490:2010 Execution of special geotechnical works - Soil nailing
EN 1537:2013 Execution of special geotechnical works - Ground anchors
EN 445:2007 Grout for prestressing tendons - Test methods
EN 934-4:2009 Admixtures for concrete, mortar and grout - Part 4: Admixtures for grout for prestressing tendons - Definitions, requirements, conformity, marking and labelling
EN 13670:2009 Execution of concrete structures
EN 14199:2015 Execution of special geotechnical works - Micropiles
DIN EN 14490:2010-11 Execution of special geotechnical works - Soil nailing
BS EN 13670:2009 Execution of concrete structures
07/30151256 DC : 0 BS EN 13670 - EXECUTION OF CONCRETE STRUCTURES
UNI EN 13670 : 2010 EXECUTION OF CONCRETE STRUCTURES
UNE-EN 14490:2013 Execution of special geotechnical works - Soil nailing
UNE-EN 1536:2011 Execution of special geotechnical work - Bored piles
BS EN 14199:2015 Execution of special geotechnical works. Micropiles
BS EN 1537:2013 Execution of special geotechnical works. Ground anchors

EN 197-1:2011 Cement - Part 1: Composition, specifications and conformity criteria for common cements
EN 1008:2002 Mixing water for concrete - Specification for sampling, testing and assessing the suitability of water, including water recovered from processes in the concrete industry, as mixing water for concrete
EN 446:2007 Grout for prestressing tendons - Grouting procedures
EN 445:2007 Grout for prestressing tendons - Test methods
EN 206-1:2000/A2:2005 CONCRETE - PART 1: SPECIFICATION, PERFORMANCE, PRODUCTION AND CONFORMITY
EN 934-4:2009 Admixtures for concrete, mortar and grout - Part 4: Admixtures for grout for prestressing tendons - Definitions, requirements, conformity, marking and labelling
EN 196-3:2016 Methods of testing cement - Part 3: Determination of setting times and soundness
EN 934-2:2009+A1:2012 Admixtures for concrete, mortar and grout - Part 2: Concrete admixtures - Definitions, requirements, conformity, marking and labelling

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.