• There are no items in your cart

I.S. EN 45510-2-6:2000

Current
Current

The latest, up-to-date edition.

GUIDE FOR PROCUREMENT OF POWER STATION EQUIPMENT - PART 2-6: ELECTRICAL EQUIPMENT - GENERATORS
Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

01-01-2000

Preview

For Harmonized Standards, check the EU site to confirm that the Standard is cited in the Official Journal.

Only cited Standards give presumption of conformance to New Approach Directives/Regulations.

Foreword
1 Scope
2 Normative references
3 Definitions
      3.1 Organizational terms
      3.2 Technical terms
      3.3 General terms
4 Brief overall project description
      4.1 Role and organization of purchaser
      4.2 Site location
      4.3 Equipment task
      4.4 Equipment to be purchased
      4.5 Control and instrumentation
      4.6 Electrical supplies and other services
      4.7 Other interfaces
      4.8 Project programme
      4.9 Equipment identification systems
5 Extent of supply
6 Terminal points
7 Operational requirements
      7.1 Operating environment
      7.2 Manning levels
      7.3 Normal operation
      7.4 Operating hours
      7.5 Start-up and shut-down
      7.6 Abnormal conditions
      7.7 Further operational requirements
8 Life expectancy
      8.1 Design life
      8.2 Components requiring periodic maintenance
9 Performance requirements
      9.1 Duty
      9.2 Performance
      9.3 Equipment margins
      9.4 Availability
      9.5 Levels of component redundancy
      9.6 Further performance requirements
10 Design and fabrication
      10.1 Specific equipment features
      10.2 Design justification
      10.3 Material selection
      10.4 Safety
      10.5 Interchangeability
      10.6 Fabrication methods
11 Maintenance requirements
      11.1 Planned maintenance
      11.2 Personnel safety
      11.3 Requirements for access
      11.4 Lifting requirements
      11.5 Special tools
      11.6 Test equipment
      11.7 Spare parts strategy
      11.8 Special precautions
12 Technical documentation requirements
      12.1 Tender documentation
      12.2 Contract documentation
13 Applicable legislation, regulations, standards and
      further requirements
      13.1 Legislation and regulations
      13.2 Standards
      13.3 Further requirements
14 Evaluation criteria
      14.1 General
      14.2 Technical criteria
15 Quality measures
      15.1 General
      15.2 Approvals procedure
      15.3 Inspection requirements
      15.4 Non-conformity
16 Site factors
      16.1 Access
      16.2 Facilities
      16.3 Site specific requirements
17 Verification of specified performance
      17.1 General
      17.2 Works tests
      17.3 Tests during installation and commissioning
      17.4 Technical conditions for trial run
      17.5 Functional and performance tests
Annex A (informative) Bibliography
Annex B (informative) Technical information schedule
Annex C (informative) List of required performances (example)

Gives a guide on writing the technical specification for the procurement of turbine-driven generators and their auxiliaries for use in electricity generating stations (power stations). Not applicable to equipment for use in the nuclear reactor plant area of nuclear power stations. Generators may be hydrogen, air or liquid-cooled. The excitation system may be of the rotating rectifier or static type fed by a rotating or static power supply. Does not prescribe the arrangement of the documents in the enquiry.

DocumentType
Standard
Pages
40
PublisherName
National Standards Authority of Ireland
Status
Current

View more information
US$83.31
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.