1. Overview
2. Definitions, acronyms, and abbreviations
3. What IEC 61850 offers
4. User considerations
5. Critical success factors
Annex A (informative) - Examples for future
2030.100 Project Authorization Request
(PAR)s
Annex B (informative) - Bibliography
This recommended practice outlines the necessary steps and procedures implementers of IEC 61850 in substations should undertake in a multi-vendor equipment environment.
Committee |
Power System Relaying and Control
|
DocumentType |
Standard
|
ISBN |
978-1-5044-4032-5
|
Pages |
67
|
PublisherName |
Institute of Electrical & Electronics Engineers
|
Status |
Current
|
IEEE 1613.1-2013 | IEEE Standard Environmental and Testing Requirements for Communications Networking Devices Installed in Transmission and Distribution Facilities |
IEEE C37.90-2005 | IEEE Standard for Relays and Relay Systems Associated with Electric Power Apparatus |
IEC 61850-5:2013 | Communication networks and systems for power utility automation - Part 5: Communication requirements for functions and device models |
IEEE 525-2007 | IEEE Guide for the Design and Installation of Cable Systems in Substations |
IEEE 1615-2007 | IEEE Recommended Practice for Network Communication in Electric Power Substations |
IEC 61850-7-2:2010 | Communication networks and systems for power utility automation - Part 7-2: Basic information and communication structure - Abstract communication service interface (ACSI) |
IEC 61850-7-410:2012+AMD1:2015 CSV | Communication networks and systems for power utility automation - Part 7-410: Basic communication structure - Hydroelectric power plants - Communication for monitoring and control |
IEEE C37.118-2005 | IEEE Standard for Synchrophasors for Power Systems |
IEC 62439-3:2016 | Industrial communication networks - High availability automation networks - Part 3: Parallel Redundancy Protocol (PRP) and High-availability Seamless Redundancy (HSR) |
IEC 61850-6:2009 | Communication networks and systems for power utility automation - Part 6: Configuration description language for communication in electrical substations related to IEDs |
IEEE 802.3-2012 | IEEE Standard for Ethernet |
IEC 60870-5-104:2006+AMD1:2016 CSV | Telecontrol equipment and systems - Part 5-104: Transmission protocols - Network access for IEC 60870-5-101 using standardtransport profiles |
IEC 81346-1:2009 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 1: Basic rules |
IEC TR 61850-90-2:2016 | Communication networks and systems for power utility automation - Part 90-2: Using IEC 61850 for communication between substations and control centres |
IEC 62381:2012 | Automation systems in the process industry - Factory acceptance test (FAT), site acceptance test (SAT), and site integration test (SIT) |
IEEE 1815.1-2015 | IEEE Standard for Exchanging Information Between Networks Implementing IEC 61850 and IEEE Std 1815(TM) [Distributed Network Protocol (DNP3)] |
IEC TR 61850-1:2013 | Communication networks and systems for power utility automation - Part 1: Introduction and overview |
IEC 81346-2:2009 | Industrial systems, installations and equipment and industrial products - Structuring principles and reference designations - Part 2: Classification of objects and codes for classes |
IEEE C37.240-2014 | IEEE Standard Cybersecurity Requirements for Substation Automation, Protection, and Control Systems |
IEC 60870-5-101:2003+AMD1:2015 CSV | Telecontrol equipment and systems - Part 5-101: Transmissionprotocols - Companion standard for basic telecontrol tasks |
IEC 61850-7-1:2011 | Communication networks and systems for power utility automation - Part 7-1: Basic communication structure - Principles and models |
IEC TR 61850-90-1:2010 | Communication networks and systems for power utility automation - Part 90-1: Use of IEC 61850 for the communication between substations |
IEC 62271-3:2015 | High-voltage switchgear and controlgear - Part 3: Digital interfaces based on IEC 61850 |
IEC TR 61850-90-5:2012 | Communication networks and systems for power utility automation - Part 90-5: Use of IEC 61850 to transmit synchrophasor information according to IEEE C37.118 |
IEC 61850-8-1:2011 | Communication networks and systems for power utility automation - Part 8-1: Specific communication service mapping (SCSM) - Mappings to MMS (ISO 9506-1 and ISO 9506-2) and to ISO/IEC 8802-3 |
IEC 61850-9-2:2011 | Communication networks and systems for power utility automation - Part 9-2: Specific communication service mapping (SCSM) - Sampled values over ISO/IEC 8802-3 |
IEC 60255-27:2013 | Measuring relays and protection equipment - Part 27: Product safety requirements |
IEC 61850-4:2011 | Communication networks and systems for power utility automation - Part 4: System and project management |
IEC 61588:2009 | Precision clock synchronization protocol for networked measurement and control systems |
IEC 61850-7-420:2009 | Communication networks and systems for power utility automation - Part 7-420: Basic communication structure - Distributed energy resources logical nodes |
IEEE 1686-2013 | IEEE Standard for Intelligent Electronic Devices Cyber Security Capabilities |
IEC 61850-7-4:2010 | Communication networks and systems for power utility automation - Part 7-4: Basic communication structure - Compatible logical node classes and data object classes |
IEC 61850-7-3:2010 | Communication networks and systems for power utility automation - Part 7-3: Basic communication structure - Common data classes |
IEC 62439-1:2010+AMD1:2012+AMD2:2016 CSV | Industrial communication networks - High availability automation networks - Part 1: General concepts and calculation methods |
IEC TS 61850-80-1:2016 | Communication networks and systems for power utility automation - Part 80-1: Guideline to exchanging information from a CDC-based data model using IEC 60870-5-101 or IEC 60870-5-104 |
IEC TR 61850-90-7:2013 | Communication networks and systems for power utility automation - Part 90-7: Object models for power converters in distributed energy resources (DER) systems |
IEC TR 61850-7-510:2012 | Communication networks and systems for power utility automation - Part 7-510: Basic communication structure - Hydroelectric power plants - Modelling concepts and guidelines |
IEC 61850-10:2012 | Communication networks and systems for power utility automation - Part 10: Conformance testing |
IEEE 1588-2008 REDLINE | IEEE Standard for a Precision Clock Synchronization Protocol for Networked Measurement and Control Systems |
IEEE 1815-2012 REDLINE | IEEE Standard for Electric Power Systems Communications-Distributed Network Protocol (DNP3) |
IEC TS 61850-2:2003 | Communication networks and systems in substations - Part 2: Glossary |
IEC 61850-3:2013 | Communication networks and systems for power utility automation - Part 3: General requirements |
IEEE 802.1W : 2001 | LOCAL AND METROPOLITAN AREA NETWORKS - COMMON SPECIFICATIONS - PART 3: MEDIA ACCESS CONTROL (MAC) BRIDGE - AMENDMENT 2: RAPID RECONFIGURATION |
Please Login or Create an Account so you can add users to your Multi user PDF Later.
Important note : All end users must be registered with an Account prior to user licenses being assigned.
Users cannot be edited or removed once added to your Multi user PDF.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.