• There are no items in your cart

ISO 19455-1:2019

Current

Current

The latest, up-to-date edition.

Planning for functional performance testing for building commissioning Part 1: Secondary hydronic pump, system and associated controls

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Language(s)

English

Published date

11-15-2019

This document specifies a planning method for functional performance testing (FPT). This document is applicable to the planning of the FPT during the design phase of new buildings and retrofit projects, which is defined in ISO 16813.

This document establishes how to design building environmental systems when the FPT is being carried out. This document defines the following:

what kind of information regarding the system is required (for example, design documents, drawings and product specifications);

what kind of data should be measured (though concrete measurement techniques are not specified in this document);

how the measured data is analysed.

Such clear definition of the FPT makes it possible for building designers to prepare and plan for FPT throughout the design process.

This document specifies an FPT method for secondary hydronic pump, system and associated controls in heating, ventilation and air conditioning (HVAC) systems.

DocumentType
Standard
Pages
14
PublisherName
International Organization for Standardization
Status
Current

Standards Relationship
NEN-ISO 19455-1:2019 Identical
BS ISO 19455-1:2019 Identical

View more information
US$111.00
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.