OIML R 106-2 : 2012
Current
The latest, up-to-date edition.
AUTOMATIC RAIL-WEIGHBRIDGES - PART 2: TEST REPORT FORMAT
01-12-2013
Foreword
1 Introduction
2 Applicability of this Test Report Format
3 Guidance for the application of this Test Report Format
4 The evaluation report
A - General information concerning the type
B - Identification of the instrument
C - Information concerning the test equipment used for type
evaluation
D - Summary of type evaluation
E - Zero-setting
F - Warm-up time
G - Influence factors
H - Disturbances
I - Span stability
J - Static weighing tests for the control instrument
K - Weighing
L - In-motion weighing tests (uncoupled, coupled or train)
M - Examination of the construction of the instrument
N - Checklist
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.