PREN 9239 : DRAFT 2014
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
12-26-2023
09-22-2014
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Framework of Risk Management in the programme
5 Risk Management process
6 Risk Management tools
7 Awareness and Training
8 Documentation
9 Opportunity management concept
Annex A (informative) - List type per category
Annex B (informative) - Example of risk sheet
Annex C (informative) - Example of qualitative and
quantitative assessments
Annex D (informative) - Example of 3 colour code
criticality and acceptability matrix: general risk
mapping
Annex E (informative) - Example of Risks Portfolio
Annex F (informative) - Risk assessment report
Annex G (informative) - Maturity of programme risk
management: assessment criteria
Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.