UIC 724 : 1ED 2005
Current
Current
The latest, up-to-date edition.
TRACK EQUIPMENT FOR 25 TONS (250 KN) AXLE LOADS ON BALLASTED TRACK
Published date
01-12-2013
Publisher
Provides recommendations for track equipment to be used on the main lines of rail networks operating freight wagons loaded at 250 kN/axle for line categories E4 and E5, as understood by UIC Leaflet 700 and running at maximum speeds of 100 km/h.
Sorry this product is not available in your region.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.