ANS 58.8 : 2019
Current
The latest, up-to-date edition.
Time Response Design Criteria for Safety-Related Operator Actions
Hardcopy , PDF
English
08-08-2019
ANS 58.8-2019 establishes criteria and methods for identifying, calculating, validating, tracking, and documenting time requirements for the performance of nuclear power plant time-limited manual actions that are associated with either design-basis events (DBEs) or licensing basis.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.