API 2220 : 2011
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Hardcopy , PDF
02-18-2021
English
01-01-2011
1 General
2 Normative References
3 Terms and Definitions
4 Owner Action to Improve Contractor Safety Performance
5 Contractor Action to Improve Safety Performance
6 Effective Safety and Health Communication
Annex A (informative) - Contract Safety Language and
Contract Addendum
Annex B (informative) - Bid Package: Request For
Information
Annex C (informative) - Workers Compensation Experience
Modification Rates
Annex D (informative) - Contractor Safety Orientation
Annex E (informative) - Contractor Safety Program Checklist
Bibliography - References Relevant To Contractor Safety
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.