AS 1012.2-1994
|
Methods of testing concrete - Preparation of concrete mixes in the laboratory |
AS 3972-1991
|
Portland and blended cements |
AS 3735-2001
|
Concrete structures for retaining liquids |
AS 1085.14-2012
|
Railway track material Prestressed concrete sleepers |
AS 4139-1993
|
Fibre-reinforced concrete pipes and fittings |
AS 2150-2005
|
Hot mix asphalt - A guide to good practice |
AS 5100.5-2004
|
Bridge design - Concrete |
AS 1597.1-2010
|
Precast reinforced concrete box culverts Small culverts (not exceeding 1200 mm span and 1200 mm height) |
AS 4139-2003
|
Fibre-reinforced concrete pipes and fittings (Reconfirmed 2018) |
AS 1597.2-2013
|
Precast reinforced concrete box culverts Large culverts (exceeding 1200 mm span or 1200 mm height and up to and including 4200 mm span and 4200 mm height) |
AS 3972-2010
|
General purpose and blended cements |
AS 3583.5-1991
|
Methods of test for supplementary cementitious materials for use with portland cement Determination of relative density (Reconfirmed 2016) |
AS 3583.2-1991
|
Methods of test for supplementary cementitious materials for use with portland cement Determination of moisture content (Reconfirmed 2016) |
AS/NZS 3725:2007
|
Design for installation of buried concrete pipes |
AS 3600-1994
|
Concrete structures |
AS/NZS 4058:2007
|
Precast concrete pipes (pressure and non-pressure) |
AS 3700-1998
|
Masonry structures |
AS 4058-1992
|
Precast concrete pipes (pressure and non-pressure) |
AS 3583.6-1995
|
Methods of test for supplementary cementitious materials for use with portland cement - Determination of relative water requirement and relative strength |
AS 1379-2007
|
Specification and supply of concrete |
AS 1379-2007
|
Specification and supply of concrete |
AS 1085.14-2003
|
Railway track material Prestressed concrete sleepers |
AS 3583.9-1991
|
Methods of test for supplementary cementitious materials for use with portland cement Determination of magnesia content (Reconfirmed 2016) |
AS 3700-2001
|
Masonry structures |
AS 1316-2003
|
Masonry cement |
AS 3700-2011
|
Masonry structures |
AS 3583.1-1998
|
Methods of test for supplementary cementitious materials for use with portland and blended cement Determination of fineness by the 45 micrometre sieve (Reconfirmed 2016) |
AS 2049-1992
|
Roof tiles |
AS 1085.14-1997
|
Railway permanent way material - Part 14: Prestressed concrete sleepers |
AS 4198-1994
|
Precast concrete access chambers for sewerage applications |
AS 2049-2002
|
Roof tiles |
AS 3648-1993
|
Specification and methods of test for packaged concrete mixes |
AS 1379-1991
|
The specification and manufacture of concrete |
AS 1379-1997
|
Specification and supply of concrete |
AS 3583.4-1991
|
Methods of test for supplementary cementitious materials for use with portland cement Determination of autoclave expansion |
AS 3583.3-1991
|
Methods of test for supplementary cementitious materials for use with portland cement Determination of loss on ignition (Reconfirmed 2016) |
AS/NZS 2566.2:2002
|
Buried flexible pipelines Installation |
AS 1597.2-1996
|
Precast reinforced concrete box culverts Large culverts (from 1500 mm span and up to and including 4200 mm span and 4200 mm height) |
AS 3583.12-1991
|
Methods of test for supplementary cementitious materials for use with portland cement Determination of available alkali (Reconfirmed 2016) |
AS/NZS 2041:1998
|
Buried corrugated metal structures |
AS 3583.8-1991
|
Methods of test for supplementary cementitious materials for use with portland cement Determination of sulfuric anhydride content (Reconfirmed 2016) |
AS 3972-1997
|
Portland and blended cements |
AS 2783-1992
|
Use of reinforced concrete for small swimming pools |