• There are no items in your cart

AS 4292.4-2006

Withdrawn
Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Railway safety management Signalling and telecommunications systems and equipment
Available format(s)

Hardcopy , PDF 1 User , PDF 3 Users , PDF 5 Users , PDF 9 Users

Withdrawn date

08-18-2021

Language(s)

English

Published date

11-10-2006

Preview

1 - AS 4292.4-2006 RAILWAY SAFETY MANAGEMENT - SIGNALLING AND TELECOMMUNICATIONS SYSTEMS AND EQUIPMENT
4 - PREFACE
5 - CONTENTS
6 - FOREWORD
7 - SECTION 1 SCOPE AND GENERAL
7 - 1.1 SCOPE
7 - 1.2 APPLICATION
7 - 1.3 REFERENCED DOCUMENTS
8 - 1.4 DEFINITIONS
8 - 1.4.1 Availability
8 - 1.4.2 Fail-safe
8 - 1.4.3 Permissible rolling stock outline
8 - 1.4.4 Reliability
8 - 1.4.5 Safety integrity
8 - 1.4.6 Safety-related system
8 - 1.4.7 Safeworking system
8 - 1.4.8 Signalling and telecommunications system
8 - 1.4.9 Shall
8 - 1.4.10 Should
8 - 1.4.11 Validation
8 - 1.4.12 Verification
9 - 1.5 FUNCTIONAL AREAS
9 - 1.6 ASSET LIFE CYCLE
10 - 1.7 ADOPTION OF EXISTING PRACTICES
10 - 1.8 HAZARD IDENTIFICATION AND RISK ANALYSIS
10 - 1.9 COMMUNICATION
10 - 1.10 HANDLING OF EXCEPTIONS
12 - SECTION 2 INTERFACE COORDINATION
13 - SECTION 3 DESIGN
13 - 3.1 GENERAL
13 - 3.2 SAFEWORKING SYSTEM SELECTION
13 - 3.2.1 Safety level justification
13 - 3.2.2 Selection procedure
13 - 3.2.3 Factors to be considered
14 - 3.3 SIGNALLING AND TELECOMMUNICATIONS SYSTEM REQUIREMENTS
14 - 3.3.1 General system requirements
15 - 3.3.2 System configuration
15 - 3.4 VERIFICATION AND VALIDATION
17 - SECTION 4 CONSTRUCTION AND IMPLEMENTATION
17 - 4.1 DETAILED REQUIREMENTS
17 - 4.2 FACTORS TO BE CONSIDERED
17 - 4.3 VERIFICATION AND VALIDATION
18 - SECTION 5 COMMISSIONING
18 - 5.1 GENERAL
18 - 5.2 INSPECTION AND TEST PLAN
20 - SECTION 6 MONITORING AND MAINTENANCE
20 - 6.1 GENERAL
20 - 6.2 MONITORING AND MAINTENANCE REQUIREMENTS
20 - 6.3 PERFORMANCE MONITORING
22 - SECTION 7 MODIFICATION
23 - SECTION 8 DECOMMISSIONING AND DISPOSAL
24 - APPENDIX A - ASSET LIFE CYCLE PHASES-DESCRIPTION AND PROCESS REQUIREMENTS
28 - APPENDIX B - INTERFACES BETWEEN ENGINEERING AND OPERATIONAL FUNCTIONS

Specifies technical requirements for signalling and telecommunications systems and equipment to be considered for inclusion in engineering and operating systems safety Standards forming part of a railway safety management system prepared in accordance with AS4292.1.

This Standard specifies requirements and provides guidelines for preparing or adopting engineering and operating systems safety standards and procedures to comply with the relevant requirements of AS 4292.1, in respect of the signalling and telecommunications system and equipment.

Committee
ME-079
DocumentType
Standard
ISBN
0 7337 7849 6
Pages
25
ProductNote
Withdrawn 13-08-21.
PublisherName
Standards Australia
Status
Withdrawn
Supersedes

First published as AS 4292.4-1997.Second edition 2006. Originated as AS 4292.4-1997. Second edition 2006.

AS 4292.2-2006 Railway safety management Track, civil and electrical infrastructure
AS/NZS 4360:2004 Risk management
AS 4292.5-2006 Railway safety management Operational systems
AS 4292.1-2006 Railway safety management General requirements
AS 4292.3-2006 Railway safety management Rolling stock

AS 4292.5-2006 Railway safety management Operational systems
AS 4292.3-2006 Railway safety management Rolling stock
AS 4292.2-2006 Railway safety management Track, civil and electrical infrastructure
AS 4292.1-2006 Railway safety management General requirements

View more information
US$55.47
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.