ASCE 39 03 : 2003
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
STANDARD PRACTICE FOR THE DESIGN AND OPERATION OF HAIL SUPPRESSION PROJECTS
Hardcopy , PDF
10-07-2021
English
01-01-2003
1.0 The Hail Problem
1.1 Historical Perspective
1.2 The Status of Hail Suppression Technology
2.0 Hail Concepts
2.1 Requirements for Hail Development
2.2 The Scientific Basis for Hail Suppression
2.3 Concept Visualization
2.4 Cloud Modeling
3.0 The Design of Hail Suppression Operations
3.1 Definition of Project Scope
3.2 Delivery Methods
3.3 Seeding Agent Selection
3.4 Meteorological Data Collection
3.5 Selection and Siting of Equipment
3.6 Legal Issues
3.7 Environmental Concerns
4.0 Operation of Hail Suppression Projects
4.1 The Operations Manual
4.2 Personnel Requirements
4.3 Operational Decision-Making
4.4 Communications
4.5 Safety Considerations
4.6 Public Relations, Information, and Involvement
5.0 Evaluation of Hail Suppression Efforts
5.1 Project Evaluation Approaches
5.2 Evaluation measures
5.3 Dissemination of Results
6.0 Glossary of Terms and Acronyms
7.0 References
8.0 Conversion of Units
Index
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.