IEEE 141 : 1993
|
IEEE Recommended Practice for Electric Power Distribution for Industrial Plants
|
FC 4-610-04F : 2015
|
FACILITIES CRITERIA - AIR FORCE LEGAL FACILITIES
|
FC 1-300-09N : Change 3
|
FACILITIES CRITERIA - NAVY AND MARINE CORPS DESIGN PROCEDURES
|
UFC 3-501-01 : 2015
|
UNIFIED FACILITIES CRITERIA - ELECTRICAL ENGINEERING
|
Z5000-18
|
Building commissioning for energy using systems
|
C656-14 (R2019)
|
Performance standard for split-system and single-package air conditioners and heat pumps
|
NFPA 99 : 2018
|
HEALTH CARE FACILITIES CODE
|
AHRI GUIDELINE W (I-P) : 2014
|
SELECTING, SIZING, & SPECIFYING PACKAGED AIR-TO-AIR ENERGY RECOVERY VENTILATION EQUIPMENT
|
UFC 4-510-01 : Change 2
|
UNIFIED FACILITIES CRITERIA - DESIGN: MILITARY MEDICAL FACILITIES
|
FC 4-211-03F : 2016
|
FACILITIES CRITERIA - AIR FORCE FIGHTER ENGINE MAINTENANCE FACILITY
|
FC 4-721-02F : 2015
|
FACILITIES CRITERIA - AIR FORCE LEVEL 1 CONFINEMENT FACILITY
|
UFC 3-101-01 : Change 3
|
UNIFIED FACILITIES CRITERIA - ARCHITECTURE
|
ASHRAE GHCDGS HEAT PUMP SYSTEMS : 2014 ERRATA 2016
|
GEOTHERMAL HEATING AND COOLING DESIGN OF GROUND-SOURCE HEAT PUMP SYSTEMS
|
FC 4-722-01N : 2013
|
FACILITIES CRITERIA - NAVY AND MARINE CORPS DINING FACILITIES
|
ASHRAE HDBK HVAC APPLICATIONS : 2015
|
ASHRAE HANDBOOK - HVAC APPLICATIONS
|
UFC 4-141-04 : Change 1
|
UNIFIED FACILITIES CRITERIA - EMERGENCY OPERATIONS CENTER PLANNING AND DESIGN
|
UFC 4-133-01 : CHANGE 1
|
UNIFIED FACILITIES CRITERIA - AIR TRAFFIC CONTROL AND AIR OPERATIONS FACILITIES
|
UFC 4-420-01 : 2015
|
UNIFIED FACILITIES CRITERIA - AMMUNITION AND EXPLOSIVES STORAGE MAGAZINES
|
FC 4-218-01F : 2015
|
FACILITIES CRITERIA - AIR FORCE CRITERIA FOR PRECISION MEASUREMENT EQUIPMENT LABORATORY DESIGN AND CONSTRUCTION
|
UFC 4-211-02 : 2012
|
UNIFIED FACILITIES CRITERIA - AIRCRAFT CORROSION CONTROL AND PAINT FACILITIES
|
C500-18
|
Monitoring and energy performance measurement of industrial refrigeration systems (IRS) using benchmark energy factor (BEF) concepts
|
ASHRAE PRINCIPLES OF HVAC : 2017
|
PRINCIPLES OF HEATING, VENTILATING AND AIR-CONDITIONING
|
ANSI/ASSP Z9.10 : 2017
|
FUNDAMENTALS GOVERNING THE DESIGN AND OPERATION OF DILUTION VENTILATION SYSTEMS IN INDUSTRIAL OCCUPANCIES
|
UFC 4-211-01 : Change 1
|
UNIFIED FACILITIES CRITERIA - AIRCRAFT MAINTENANCE HANGARS
|
NEMA LSD 64 : 2014
|
LIGHTING CONTROLS TERMINOLOGY
|
UFC 3-420-01 : Change 10
|
UNIFIED FACILITIES CRITERIA - PLUMBING SYSTEMS
|
UFC 1-201-01 : 2013
|
UNIFIED FACILITIES CRITERIA - NON-PERMANENT DOD FACILITIES IN SUPPORT OF MILITARY OPERATIONS
|
UFC 3-110-03 : Change 2
|
UNIFIED FACILITIES CRITERIA - ROOFING
|
BS ISO 18523-1:2016
|
Energy performance of buildings. Schedule and condition of building, zone and space usage for energy calculation Non-residential buildings
|
CSA SPE 501 : 2018
|
IDEAL STATE BENCHMARKING AND APPLICATION OF BENCHMARK ENERGY FACTOR FOR INDUSTRIAL SYSTEMS AND PROCESSES
|
NASA SSTD 8070 0085 : 2008
|
LIGHTING DESIGN, OPERATION, AND MAINTENANCE STANDARD FOR ENERGY CONSERVATION
|
ISO 23045:2008
|
Building environment design Guidelines to assess energy efficiency of new buildings
|
ASTM E 2813 : 2012
|
Standard Practice for Building Enclosure Commissioning
|
ICC IECC CODE AND COMMENTARY : 2015
|
IECC® Code and Commentary
|
ASTM E 2813 : 2012 : EDT 1
|
Standard Practice for Building Enclosure Commissioning
|
NASA SSTD 8070 0084 : 2014
|
HVAC AND DOMESTIC HOT WATER DESIGN STANDARD
|
AIHA Z9.10 : 2010
|
FUNDAMENTALS GOVERNING THE DESIGN AND OPERATION OF DILUTION VENTILATION SYSTEMS IN INDUSTRIAL OCCUPANCIES
|
ASTM E 2634 : 2017-06
|
SPECIFICATION FOR FLAT WALL INSULATING CONCRETE FORM (ICF) SYSTEMS
|
NASA SSTD 8070 0086 : 2016
|
HVAC AND DOMESTIC HOT WATER OPERATIONAL AND MAINTENANCE STANDARD FOR ENERGY CONSERVATION
|
ASHRAE HDBK REFRIGERATION : 2014
|
ASHRAE HANDBOOK - REFRIGERATION
|
IES RP 2 : 2017
|
RECOMMENDED PRACTICE FOR RETAIL LIGHTING
|
IES RP 7 : 2017
|
RECOMMENDED PRACTICE FOR LIGHTING INDUSTRIAL FACILITIES
|
CSA C743 : 2009:R2014
|
PERFORMANCE STANDARD FOR RATING PACKAGED WATER CHILLERS
|
CSA C448 SERIES : 2016
|
DESIGN AND INSTALLATION OF GROUND SOURCE HEAT PUMP SYSTEMS FOR COMMERCIAL AND RESIDENTIAL BUILDINGS
|
CSA C743 : 2009 : R2014
|
PERFORMANCE STANDARD FOR RATING PACKAGED WATER CHILLERS
|
Z317.5-17
|
Illumination design in health care facilities
|
IEEE DRAFT 602 : D2 2006
|
ELECTRIC SYSTEMS IN HEALTH CARE FACILITIES
|
CSA C743 : 2009
|
PERFORMANCE STANDARD FOR RATING PACKAGED WATER CHILLERS
|
CAN/CSA-C746-17
|
Energy performance rating for large and single packaged vertical air conditioners and heat pumps
|
ISO 18523-1:2016
|
Energy performance of buildings Schedule and condition of building, zone and space usage for energy calculation Part 1: Non-residential buildings
|
CSA Z317.2 : 2010
|
SPECIAL REQUIREMENTS FOR HEATING, VENTILATION, AND AIR-CONDITIONING (HVAC) SYSTEMS IN HEALTH CARE FACILITIES
|