BS 6400:1985
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Hardcopy , PDF
03-15-1997
English
01-31-1985
Foreword
Committees responsible
Specification
Section one. General
1 Scope
2 Definitions
3 Exchange of information and time schedule
Section two. Materials, components and meter location
4 Materials and components
5 Meter location
6 Meter and associated controls
Section three. Installation
7 Fixing the meter
8 Warning notices
Section four. Testing and purging
9 Inspection and testing for soundness
10 Purging
11 Meter and governor operation
Section five. Termination of supplies
12 General
Appendix
A Soundness test procedure
Table
1 Maximum permissible pressure loss for installations
with appliances fitted
Figures
1 Typical arrangement of meter and associated controls
2 Typical external access built-in meter box
3 Typical method of connecting temporary continuity
bond
4 Preferred method of terminating supply with the
meter remaining in position
5 Typical warning label
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.