• There are no items in your cart

BS EN 50342-1:2015+A2:2021

Current

Current

The latest, up-to-date edition.

Lead-acid starter batteries General requirements and methods of test

Available format(s)

Hardcopy , PDF

Language(s)

English

Published date

03-11-2022

TC21X working group 3 has been agree to implement following changes to EN 50342-1:2015/1:2018 - Deletion of high current discharge after water consumption test. This is not needed as a dedicated corrosion test is available in the document. - Limitation of the maximum discharge time in cranking performance test. Batteries with high power capability might be damaged if discharge until the cut off voltage of 6,0 V is reached. To prevent this the maximum discharge time of the second step of the cranking performance test has been limited to 180 s.

Committee
PEL/21
DocumentType
Standard
Pages
30
PublisherName
British Standards Institution
Status
Current
Supersedes

Standards Relationship
EN 50342-1:2015/A2:2021 Identical

View more information
US$243.59
Excluding Tax where applicable

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.