BS ISO 16075-1:2015
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
Guidelines for treated wastewater use for irrigation projects The basis of a reuse project for irrigation
Hardcopy , PDF
12-02-2020
English
08-31-2015
Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions, and abbreviated terms
4 Improving the quality and the use of TWW
5 Basis of a reuse project for irrigation
6 Influencing factors for TWW irrigation projects: water
quality, climate, and soil
7 Different effects on public health, soil, crops, and
water sources
Annex A (informative) - Examples of climate and
soil criteria
Annex B (informative) - Examples of maximum levels of
nutrients and salinity factors in TWW for
irrigation
Annex C (informative) - Example of groundwater
sensitivity groups
Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.