CSA S475 : 2003
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
SEA OPERATIONS
Hardcopy , PDF
11-01-2010
English
01-01-2003
Preface
1 Scope
2 Definitions and Abbreviations
2.1 Definitions
2.2 Abbreviations
3 Reference Publications
4 Requirements
4.1 General Principles
4.2 Environmental considerations
4.3 Personnel
4.4 Site and route surveys and preparation
4.5 Procedures and briefing manuals
4.6 Contingency plans
4.7 Model tests
4.8 Loads and load effects during sea operations
4.9 Navigation
4.10 Quality assurance
5 Sea Operations Involving Concrete Fixed Offshore
Platforms
5.1 Float-Out
5.2 Construction Afloat
5.3 Loadout of Structure or Deck
5.4 Deck Tow
5.5 Deck Mating Afloat
5.6 Sea Operation Systems Commissioning
5.7 Tow
5.8 Installation
5.9 Module Transport
5.10 Lifting
5.11 Decommissioning
6 Sea Operations Involving Steel Fixed Offshore
Structures
6.1 Building Basin and Float-Out
6.2 Construction Afloat
6.3 Loadout Structure or Deck
6.4 Deck Tow
6.5 Sea Operation Commissioning
6.6 Tow
6.7 Structure and Piling Installation
6.8 Module Transport
6.9 Deck Mating
6.10 Lifting
6.11 Decommissioning
7 Sea Operations Involving Jack-Up Offshore Structures
7.1 Jack-Up Tow
7.2 Jack-Up Installation
7.3 Module Transport
7.4 Lifting
7.5 Decommissioning
8 Sea Operations Involving Fixed Offshore Structures in
Arctic Areas
8.1 General
8.2 Contingency Plans
8.3 Site and Route Surveys
8.4 Strength
8.5 Damaged Stability
8.6 Tow
Appendices
A - Load Factors for Lifts
B - Bibliography
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.