• There are no items in your cart

DD IEC TS 62257-4 : DRAFT 2005

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

RECOMMENDATIONS FOR SMALL RENEWABLE ENERGY AND HYBRID SYSTEMS FOR RURAL ELECTRIFICATION - PART 4: SYSTEM SELECTION AND DESIGN

Superseded date

01-31-2016

Published date

11-23-2012

FOREWORD
INTRODUCTION
1 Scope
2 Normative references
3 Terms and definitions
4 Functional requirements of production and distribution
  subsystems
  4.1 Preliminaries
  4.2 Overall needs to be satisfied
  4.3 Introduction to subsystems
  4.4 Functional description of a production subsystem
  4.5 Functional description of a distribution subsystem
  4.6 Functional description of a demand subsystem
  4.7 Constraints to be complied with by production
      distribution and demand subsystems
5 Energy management rules
  5.1 General
  5.2 Functional description for an energy management of
      an isolated system
  5.3 Demand side management
6 Expected results from the sizing process
  6.1 Introduction
  6.2 Participants in the sizing process
  6.3 Elements for comparing various design proposals
  6.4 Frameworks for proposal
  6.5 Proposal for a sizing process
  6.6 Impact of design assumptions on system sizing and cost
  6.7 Guarantee of results
7 Data acquisition rules for system management
  7.1 Introduction
  7.2 General
  7.3 Levels of data acquisition and data necessity
  7.4 Data to be collected
  7.5 Operating conditions, electrical and engineering
      requirements for data acquisition
Annex A (informative) Example for detailed performance
        criteria and levels for a production subsystem
Annex B (informative) Example for detailed performance
        criteria and levels for a distribution subsystem
Annex C (informative) Example framework for proposal
        specification
Annex D (informative) Equation for costs calculations
Annex E (informative) Proposal for a sizing process

Gives a method for describing the results to be achieved by the electrification system independently of the technical solutions that could be implemented.

Committee
GEL/82
DevelopmentNote
Supersedes 03/318810 DC. (01/2006)
DocumentType
Draft
PublisherName
British Standards Institution
Status
Superseded
SupersededBy
Supersedes

Standards Relationship
IEC TS 62257-4:2015 Identical

IEC TS 62257-1:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 1: General introduction to IEC 62257 series and rural electrification
IEC TS 62257-5:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 5: Protection against electrical hazards
IEC TS 62257-2:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 2: From requirements to a range of electrification systems
IEC TS 62257-3:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 3: Project development and management
IEC TS 62257-6:2015 Recommendations for renewable energy and hybrid systems for rural electrification - Part 6: Acceptance, operation, maintenance and replacement

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.