DEFSTAN 00-45(PT2)/1(2006) : 2006
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
USING RELIABILITY CENTRED MAINTENANCE TO MANAGE ENGINEERING FAILURES - PART 2: DEVELOPING AN RCM PROJECT PLAN
Hardcopy , PDF
02-15-2008
English
01-01-2006
Foreword
Introduction
1 Scope
2 Warning
3 The Elements of RCM
3.1 Scoping the Analysis
3.2 End Item Operating Context
3.3 Functional Partitioning
3.4 Functionally and Structurally Significant
Candidate Selection
3.5 Compartments or Zonal Plan
3.6 Analysis Level Operating Context
3.7 Functional FMECA
3.8 RCM Decision Logic
3.9 Redesign and Change Action
3.10 Task Packaging
4 Zonal and External Surface Areas Analysis
5 RCM Team Construction and RCM Analysis Stakeholders
6 Assumptions, Constraints and General Information
7 Data Recording and Presentation
8 Auditing
9 Age Exploration
10 RCM Analysis Progression Chart
11 RCM Deliverables
12 Schedules Production and Distribution
13 Implementation of the Maintenance Programme
14 Sustaining the Maintenance Programme
Annex A - Reliability Centered Maintenance Project Plan
A.1 Introduction
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.