• There are no items in your cart

DEFSTAN 02-703/1(2000) : 2000

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by
superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

THERMAL AND ACOUSTIC INSULATION OF HULL AND MACHINERY

Superseded date

06-08-2011

Published date

01-12-2013

TITLE PAGE
SCOPE
FOREWORD
Sponsorship
Conditions of Release
General
MOD Tender or Contract Process
Related Documents
Health and Safety
Warning
CONTENTS
SECTION 1 - THERMAL INSULATION - GENERAL PRINCIPLES
SECTION 2 - ACOUSTIC TREATMENT - GENERAL PRINCIPLES
            2.1 Acoustic Absorption Treatment
            2.2 Acoustic Insulation Treatment
            2.3 Application of Acoustic Absorption and
                Insulation Treatment
SECTION 3 - SELECTION OF CONTRACTORS FOR THE THERMAL AND
            ACOUSTIC INSULATION OF HULL AND MACHINERY
SECTION 4 - THERMAL INSULATION STRUCTURE SURFACE SHIPS
            4.1 Areas to be Insulated
            4.2 Surface Preparation
            4.3 Insulation Type
            4.4 Insulation Thickness - External Structure
            4.5 Insulation Thickness - Internal Structure
            4.6 Insulation Procedures
            4.7 Insulation Finish
SECTION 5 - ACOUSTIC TREATMENT STRUCTURE SURFACE SHIPS
            5.1 Surface Preparation
            5.2 Type of Treatment
            5.3 Thickness of Treatment
            5.4 Guidance Drawings
            5.5 Installation Procedures
            5.6 Treatment Finish
SECTION 6 - THERMAL INSULATION STRUCTURE SUBMARINES
            6.1 Areas to be insulated
            6.2 Surface Preparation
            6.3 Insulation Type
            6.4 Insulation Thickness
            6.5 Insulation Procedures
            6.6 Insulation Finish
SECTION 7 - FIRE BARRIER INSULATION
            7.1 Areas to be insulated
            7.2 Surface Preparation
            7.3 Insulation Type
            7.4 Insulation Thickness
            7.5 Insulation Procedure
            7.6 Insulation Finish
SECTION 8 - THERMAL INSULATION VENTILATION TRUNKING SURFACE SHIPS
            8.1 Areas to be Insulated
            8.2 Surface Preparation
            8.3 Insulation Type
            8.4 Insulation Thickness
            8.5 Insulation Procedures
            8.6 F/R Cork Sheet Insulation
            8.7 MFMB Insulation
            8.8 Insulation Finish
SECTION 9 - THERMAL INSULATION VENTILATION TRUNKING SUBMARINES
            9.1 Areas to be insulated
            9.2 Surface Preparation
            9.3 Insulation Type
            9.4 Insulation Procedures
            9.5 Insulation Finish
SECTION 10 - ACOUSTIC TREATMENT VENTILATION TRUNKING SURFACE
             SHIPS AND SUBMARINES
             10.1 Areas to be treated
             10.2 Surface Preparation
             10.3 Type of treatment
             10.4 Thickness of treatment
             10.5 Installation Procedures
SECTION 11 - THERMAL AND ACOUSTIC INSULATION OF VOICE PIPES
             SURFACE SHIPS
             11.1 Areas to be insulated
             11.2 Surface Preparation
             11.3 Insulation Type
             11.4 Insulation Thickness
             11.5 Insulation Procedures
             11.6 Insulation Finish
SECTION 12 - THERMAL INSULATION OF PIPING AT 80 DEGREES AND
             BELOW SURFACE SHIPS AND SUBMARINES
             12.1 Areas to be insulated
             12.2 Surface Preparation
             12.3 Insulation Type
             12.4 Insulation Thickness
             12.5 Insulation Procedures
             12.6 Insulation Finish - Surface Ships
             12.7 Insulation Finish - Submarines
             12.8 Importance of an effective vapour barrier
SECTION 13 - THERMAL INSULATION OF PIPING ABOVE 80
             DEGREES C - SURFACE SHIPS AND SUBMARINES
             13.1 Areas to be insulated
             13.2 Surface Preparation
             13.3 Insulation Type
             13.4 Insulation Thickness
             13.5 Reference Drawings
             13.6 Insulation Procedures
             13.7 Insulation Finish Surface Ships Only
             13.8 Submarines
SECTION 14 - MODULAR INSULATION (MODLAG) - SURFACE SHIPS AND SUBMARINES
             14.1 Introduction
             14.2 Areas to be insulated
             14.3 Surface Preparation
             14.4 Insulation Type
             14.5 Insulation Thickness
             14.6 Design, Manufacture and Identification of
                  MODLAGs
             14.7 Insulation Procedures
             14.8 Insulation Finish
SECTION 15 - THERMAL INSULATION OF DRAINS FROM HOT
             EQUIPMENT - SURFACE SHIPS AND SUBMARINES
             15.1 Areas to be insulated
             15.2 Surface Preparation
             15.3 Insulation Type
             15.4 Insulation Thickness
             15.5 Reference Drawings
             15.6 Insulation Procedures
             15.7 Insulation Finish
             15.8 SUBMARINES
SECTION 16 - THERMAL INSULATION OF STEAM TURBINE CYLINDERS,
             DRAIN COOLERS, HEAT EXCHANGERS, PUMPS - SURFACE
             SHIPS AND SUBMARINES
             16.1 Areas to be insulated
             16.2 Surface Preparation
             16.3 Insulation Type
             16.4 Insulation Thickness
             16.5 Reference Drawings
             16.6 Insulation Procedures
             16.7 Insulation Finish
             16.8 SUBMARINES
SECTION 17 - THERMAL INSULATION OF WT BOILERS AND BACK UP
             INSULATION TO FURNACE LINING SURFACE SHIPS
             17.1 Areas to be insulated
             17.2 Surface Preparation
             17.3 Insulation Type
             17.4 Insulation Thickness
             17.5 Insulation Procedures
             17.6 Insulation Finish
SECTION 18 - THERMAL INSULATION OF BOILER UPTAKES - SURFACE SHIPS
             18.1 Areas to be insulated
             18.2 Surface Preparation
             18.3 Insulation Type
             18.4 Insulation Thickness
             18.5 Insulation Procedures
             18.6 Finish to Insulation
SECTION 19 - THERMAL INSULATION OF DIESEL ENGINE EXHAUST
             SYSTEMS - SURFACE SHIPS AND SUBMARINES
             19.1 Areas to be insulated
             19.2 Surface Preparation
             19.3 Insulation Type
             19.4 Insulation Thickness
             19.5 Reference Drawings
             19.6 Insulation Procedures
             19.7 Insulation Finish - excluding integral insulation
SECTION 20 - THERMAL AND ACOUSTIC INSULATION OF GAS TURBINE
             UPTAKES - SURFACE SHIPS
             20.1 Areas to be insulated
             20.2 Surface Preparation
             20.3 Insulation Type
             20.4 Insulation Thickness
             20.5 Reference Drawings
             20.6 Insulation Procedures
             20.7 Insulation Finish
ANNEX A - RELATED DOCUMENTS
ANNEX B - DEFINITIONS AND ABBREVIATIONS
ANNEX C - EXPLANATORY NOTES TO ANNEX

Applicable to the thermal, fire barrier and acoustic insulation of the structure and, where appropriate, the systems, ventilation trunking and machinery of HM Ships and Submarines.

DevelopmentNote
This is a redesignation of NES 703. (01/2001)
DocumentType
Standard
PublisherName
UK Ministry of Defence Standards
Status
Superseded
SupersededBy
Supersedes

DEFSTAN 02-319/3(2009) : 2009 REQUIREMENTS FOR AVIATION FUEL SYSTEMS IN HM SURFACE SHIPS
DEFSTAN 02-718/1(2002) : 2002 REQUIREMENTS FOR SEWAGE PLANT AND ANCILLARY EQUIPMENT IN HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-330/2(2007) : 2007 REQUIREMENTS FOR MAIN PROPULSION PLANT CONDENSERS IN NUCLEAR POWERED SUBMARINES
DEFSTAN 02-314/3(2005) : 2005 COMPRESSED AIR SYSTEMS
DEFSTAN 02-123(PT1)/2(2002) : 2002 REQUIREMENT FOR LAUNDRIES AND ASSOCIATED COMPARTMENTS - PART 1: LAUNDRIES AND ASSOCIATED COMPARTMENTS
DEFSTAN 02-106(PT1)/2(2010) : 2010 REQUIREMENTS FOR MEDICAL & DENTAL ORGANIZATION IN HM SURFACE SHIPS AND SUBMARINES - PART 1: COMMON REQUIREMENTS - MEDICAL & DENTAL FACILITIES
DEFSTAN 00-101(PT2)/1(2005) : 2005 DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 2: SUBMARINES
DEFSTAN 02-121(PT1)/3(2010) : 2010 REQUIREMENTS FOR GALLEYS AND ASSOCIATED SPACES - PART 1: COMMON REQUIREMENTS
DEFSTAN 02-319/2(2002) : INTERIM REQUIREMENTS FOR AVIATION FUEL SYSTEMS IN HM SURFACE SHIPS
DEFSTAN 02-320/3(2009) : 2009 REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF FUEL SYSTEMS FOR GAS TURBINE ENGINES AND DIESEL ENGINES IN HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-101(PT1)/2(2005) : 2005 REQUIREMENTS FOR DESIGN AND FITTING OUT OF WORKSHOPS MAINTENANCE SPACES AND ENGINEERING STORES FOR HM SURFACE SHIPS - PART 1: COMMON REQUIREMENTS
DEFSTAN 02-120/2(2002) : INTERIM REQUIREMENTS FOR WATER CLOSETS, URINALS, BATHROOMS AND WASHING FACILITIES IN HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-102(PT1)/3(2005) : 2005 REQUIREMENTS FOR AIR-CONDITIONING AND VENTILATION - PART 1: HM SURFACE SHIPS AND ROYAL FLEET AUXILIARIES
DEFSTAN 02-329/2(2005) : 2005 REQUIREMENTS FOR HEAT EXCHANGERS FOR HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-348/2(2008) : 2008 GUIDE TO THE DESIGN, CORROSION ASSESSMENT AND STRESS ANALYSIS OF STEAM SYSTEMS PIPEWORK
DEFSTAN 02-802/1(2008) : 2008 REQUIREMENTS FOR MINERAL WOOL PRODUCTS FOR ACOUSTIC AND THERMAL INSULATION
DEFSTAN 02-329/3(2010) : 2010 REQUIREMENTS FOR HEAT EXCHANGERS FOR HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-309/3(2007) : 2007 REQUIREMENTS FOR GAS TURBINES
DEFSTAN 02-121(PT1)/2(2006) : 2006 REQUIREMENTS FOR GALLEYS AND ASSOCIATED SPACES - PART 1: COMMON REQUIREMENTS
DEFSTAN 02-797(PT1)/3(2009) : 2009 PIPEWORK ENGINEERING - PART 1: GENERAL
DEFSTAN 00-101(PT1)/1(2005) : 2005 DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 1: SURFACE SHIPS
DEFSTAN 02-806/2(2010) : 2010 REQUIREMENTS FOR CERAMIC PRODUCTS FOR THERMAL INSULATION APPLICATIONS: CERAMIC ROPE AND CERAMIC BLANKET
DEFSTAN 02-314/2(2001) : INTERIM COMPRESSED AIR SYSTEMS
DEFSTAN 02-309/2(2002) : 2002 REQUIREMENTS FOR GAS TURBINES
DEFSTAN 02-105(PT1)/3(2010) : 2010 REQUIREMENTS FOR FITTING OUT OF OFFICES (EXCLUDING OPERATIONAL/COMMUNICATION OFFICES) IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS
DEFSTAN 02-805/1(2010) : 2010 REQUIREMENTS FOR VAPOUR BARRIER COATINGS AND PROPRIETARY FLEXIBLE MASTIC SEALERS FOR USE ON INSULATION MATERIALS
DEFSTAN 02-803/1(2010) : 2010 REQUIREMENTS FOR POLYMER FOAMS FOR THERMAL INSULATION
DEFSTAN 02-728/3(2010) : 2010 REQUIREMENTS FOR DOMESTIC HOT AND COLD FRESH WATER SYSTEMS
DEFSTAN 02-320/2(2002) : INTERIM REQUIREMENTS FOR THE DESIGN AND INSTALLATION OF FUEL SYSTEMS FOR GAS TURBINE ENGINES AND DIESEL ENGINES IN HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-804/1(2008) : 2008 REQUIREMENTS FOR CORK PRODUCTS FOR THERMAL INSULATION
DEFSTAN 02-105(PT1)/2(2004) : 2004 REQUIREMENTS FOR FITTING OUT OF OFFICES (EXCLUDING OPERATIONAL/COMMUNICATION OFFICES) IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS
DEFSTAN 02-350/2(2006) : 2006 GUIDANCE FOR THE PRE-TRIAL INSPECTIONS OF MAIN AND AUXILIARY MACHINERY INSTALLATIONS AND SYSTEMS IN HM SURFACE SHIPS
DEFSTAN 02-125/2(2004) : 2004 REQUIREMENTS FOR NAAFI COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES
DEFSTAN 02-800/1(2010) : 2010 REQUIREMENTS FOR CALCIUM SILICATE PRODUCTS FOR THERMAL INSULATIONS
DEFSTAN 02-126(PT1)/3(2010) : 2010 REQUIREMENTS FOR STORES COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS
DEFSTAN 02-801/1(2010) : 2010 REQUIREMENTS FOR GLASS FIBRE PRODUCTS FOR USE IN THERMAL INSULATION APPLICATIONS
DEFSTAN 02-716/3(2007) : 2007 REQUIREMENTS FOR WINTERIZATION OF HM SURFACE SHIPS
DEFSTAN 00-101(PT2)/2(2008) : 2008 DESIGN STANDARDS FOR EXPLOSIVES SAFETY IN MOD SHIPS AND SUBMARINES - PART 2: SUBMARINES
DEFSTAN 02-782/2(2010) : 2010 REQUIREMENTS FOR ADHESIVE FOR MINERAL WOOL MARINE BOARD (MWMB)
DEFSTAN 02-126(PT1)/2(2004) : 2004 REQUIREMENTS FOR STORES COMPARTMENTS IN HM SURFACE SHIPS AND SUBMARINES - PART 1: GENERAL REQUIREMENTS
DEFSTAN 02-716/2(2002) : 2002 REQUIREMENTS FOR WINTERIZATION ON HM SURFACE SHIPS

DEFSTAN 83-48/4(2003) : 2003 CLOTHS, PLAIN WEAVE, COTTON
NES 119 PT1 : ISSUE 2 REQUIREMENTS FOR FIRE PROTECTION AND DAMAGE CONTROL FOR SURFACE SHIPS - PART 1: POLICY FOR SURFACE SHIPS
NES 800 PT 2 : ISSUE 2 REQUIREMENTS FOR INSULATION MATERIAL CALCIUM SILICATE PRODUCTS - CALCIUM SILICATE PRODUCTS SILICATE FILLING COMPOUND
TS 10194 : LATEST
NES 119 PT3 : ISSUE 2 REQUIREMENTS FOR FIRE PROTECTION AND DAMAGE CONTROL FOR SURFACE SHIPS - PART 3: SURFACE SHIP AND SUBMARINE EQUIPMENT
NES 706 : ISSUE 2 AMD 6 WELDING AND FABRICATION OF SHIP STRUCTURE
DEFSTAN 80-78/2(1995) : 1995 PAINT, FINISHING, FLAME RETARDANT, BRUSHING
DEFSTAN 81-25/3(1998) : 1998 TAPE, PRESSURE-SENSITIVE ADHESIVE (WATER-RESISTANT FABRIC)
BS 3779:1985 Specification for glass and glass polyester fibre woven tapes for electrical purposes
DEFSTAN 80-77/2(1995) : 1995 PAINT, PRIMING, FLAME RETARDANT, BRUSHING
NES 102 : ISSUE 1 REQUIREMENTS FOR AIR CONDITIONING & VENTILATION DESIGN
NES 800 PT 1 : ISSUE 3 AMD 2 REQUIREMENTS FOR THERMAL INSULATION MATERIAL - CALCIUM SILICATE SLAB AND SECTIONS INSULATION MATERIAL
NES 726 : ISSUE 4 AMD 1 REQUIREMENTS FOR CLEANLINESS OF SHIPS DURING BUILD
NES 778 : ISSUE 4 REQUIREMENTS FOR CONSTRAINED LAYER DAMPING (CLD) SYSTEMS ON SURFACE SHIPS & SUBMARINES
NES 774 : ISSUE 4 REQUIREMENTS FOR PREPARATION AND PAINTING SUBMARINES

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.