• There are no items in your cart

EN 50518-1:2010

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

Monitoring and alarm receiving centre - Part 1: Location and construction requirements

Withdrawn date

04-01-2013

Published date

04-16-2010

This Part 1 of EN 50518 specifies the minimum requirements for the design, construction, and functioning equipment for premises where the monitoring, receiving and processing of (alarm) signals generated by alarm systems takes place as an integrated part of the total safety and security process. The requirements apply for applications in a remote configuration where multiple systems report to a single or multiple Alarm Receiving Centre(s) (ARC) as well as to a single site facility aimed for the monitoring and processing of alarms generated by one or more alarm systems installed within the perimeter of that particular site.

Committee
CLC/TC 79
DocumentType
Standard
PublisherName
European Committee for Standards - Electrical
Status
Withdrawn

Standards Relationship
BS EN 50518-1:2010 Identical
UNE-EN 50518-1:2011 Identical

View more information
Sorry this product is not available in your region.

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.