FM 5519 : 2001
Current
The latest, up-to-date edition.
01-12-2013
1. INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 Basis for Requirements
1.4 Basis for FM Approval
1.5 Basis for Continued Approval
1.6 Effective Date
1.7 System of Units
1.8 Applicable Documents
1.9 Definitions
2. GENERAL INFORMATION
2.1 Product Information
2.2 Approval Application Requirements
2.3 Requirements for Samples for Examination
3. GENERAL REQUIREMENTS
3.1 Review of Documentation
3.2 Markings
3.3 Manufacturer's Installation and Operation Instructions
3.4 Calibration
4. PERFORMANCE REQUIREMENTS
4.1 Fire Extinguishing Effectiveness
4.2 Uniform Corrosion
4.3 Stress Corrosion
4.4 Pitting Corrosion
4.5 Specific Gravity
4.6 Viscosity/Onset of Freezing Point/Maximum Melting Point
4.7 pH Test
4.8 Sodium Content
4.9 Chloride Content
4.10 Additional Tests
5. OPERATIONS REQUIREMENTS
5.1 Demonstrated Quality Control Program
5.2 Facilities and Procedures Audit (F&PA)
5.3 Manufacturer's Responsibilities
5.4 Manufacturing and Production Tests
APPENDIX A: UNITS OF MEASUREMENT
APPENDIX B: APPROVAL MARKS
APPENDIX C: VISCOSITY-TEMPERATURE PLOT
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.